Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC, Page 140 of 140
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
| Summary |
Threaded
2783 Entries
Goto page
Previous
1
,
2
,
3
...
138
,
139
, 140
ID
Date
Author
Category
Type
Module
Target/Number
Subject
Text
6
Tuesday, July 19, 2011, 11:52
chad fisher
South Hot-Cell
Standard Operation
TM4
Ta#36
New target Ta#36 Installed on TM4
Ta#36 has been installed on TM4 and is
awaiting leak and electrical check.
A small piece of the standard top
5
Tuesday, July 19, 2011, 11:17
Travis Cave
South Hot-Cell
Standard Operation
TM4
Ta#35
Move of TM#4 from East target station to south hot cell.
Move went well no problems readings at
East Target Station were very high at 500mSv/hr.
4
Thursday, June 30, 2011, 16:04
Pierre Bricault
Conditioning Station
Repair
TM1
TM1 status
Friday June 24 2011
The target module has been moved
to the Conditioning Station (CS)
Goto page
Previous
1
,
2
,
3
...
138
,
139
, 140
ELOG V2.9.2-2455