Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 138 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  2730   Wednesday, December 04, 2024, 09:00 David WangFacilitiesStandard OperationTM2 all water lines on TM2 have been purged.

all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. 

  2731   Wednesday, December 04, 2024, 10:40 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - SHC to silo

TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth.

  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini Vault

Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails staged for packaging into F-308s.

Nb#10, Pail 295, Tray 4A
C#4, Pail 277, Tray 4C
Ta#64, Pail 273, Tray 5C
Ta#62 with wire scanner, Pail 256, Tray 7A
TiC#5, Pail 279, Tray 3A

The target index has been updated accordingly (see attached but note that the summary does not reflect the sixth pail).

Attachment 1: MiniVault_2024-12-18.pdf
MiniVault_2024-12-18.pdf MiniVault_2024-12-18.pdf
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - Inspection

An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection was performed June 18, 2024 for this year.

The attachment to this e-log serves as a record of all inspections for this tool throughout 2024.

The spare tool was not inspected as it was not in service this year.

Attachment 1: ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target Hall

A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • Hot Cells:
    • NHC right manipulator gripper stuck (known, repair planned)
  • Target Hall:
    • 50% of overhead light bulbs burnt out (David Wang contacted Electrical Services to rectify)
    • One RH camera for target pit not working (Travis Cave notified)

Action has been taken on all deficiencies.

  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings

ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced in March when general fielding in vacuum pit is reasonable for the job.

  2751   Monday, January 20, 2025, 11:33 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - six flasks loaded

Today (2025-01-20), six flasks were loaded in preparation for shipment with the following targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, SiC#44

Some of the pails (256, 273, 279, 277) required replacement of the wire rope cable with new style, 30 ft length, as requested by CNL. A lifting label was also applied to these pails. Some of the pails (295, 298) already had the appropriate cable and lifter label.

 

At the time of writing this log:

  • The second crimped lifting loop has not yet been applied to each pail.
  • The locks have not yet been applied to the flasks.

 

The mini-storage vault is now EMPTY. The mini-storage vault has been swiped and checked for contamination.

The target index spreadsheet has been updated (attached).

Attachment 1: Target_Index_2025-01-20.xlsm
  2752   Tuesday, January 21, 2025, 10:46 David WangITE/ITWStandard Operation  ITW/ITE pit general annual cleaning up.

ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum  cleaned. HV cage inside and blue nylon insulators were wiped by paper.

  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages

 David and I cleaned both cages in ISAC1 electric room, all done.

ELOG V2.9.2-2455