2139
|
Thursday, August 27, 2020, 08:21 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#60 | Helium pressure check on TM2 HS line at TCS. | Helium pressurize on TM2 HS line at TCS
is done. Base LR is 0.0X
E-9 |
|
2140
|
Thursday, August 27, 2020, 09:42 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | Ta#60 | Refilled TK2 | Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve. |
|
2142
|
Thursday, August 27, 2020, 13:18 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | New Power Supply installed for TGHT | Arthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power |
|
2148
|
Thursday, September 24, 2020, 11:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#31 | TM4 HS line leak check at SHC and TCS. | Both helium spray and helium pressurize
on TM4 HS line withUCx31 target are done
at SHC and TCS. No leak. |
|
2166
|
Thursday, November 19, 2020, 09:00 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#6 | Helium pressure check on TM2 HS line at TCS. | LD 0.0 Xe-9 atm.cc/sec , 70 psi helium
3 minutes. No leak. |
|
2171
|
Monday, December 07, 2020, 12:20 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 has been moved from
the South Hot Cell to the
Conditioning Station. No containment box. |
|
2175
|
Monday, January 04, 2021, 12:13 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box. |
|
2184
|
Wednesday, February 03, 2021, 09:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 from TCS to SW silo. | TM4 is moved from TCS to SW silo. The moving
is smooth.
|
|
2193
|
Tuesday, March 02, 2021, 08:12 |
David Wang | Conditioning Station | Standard Operation | | | TCS leak check. | TCS leak check: TCS IG1S1.6 XE- 6 torr.
LD 0.0XE-9atm.cc/sec.We used a long
pole to spray helium to TCS vacuum seals |
|
2195
|
Thursday, March 04, 2021, 13:54 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 has been moved to NHC from silo | TM3 has been moved from silo to NHC. The
move is successful. NHC ram stand and NHC
protection railings are checked and installed. |
|
2204
|
Thursday, March 25, 2021, 08:55 |
Anders Mjos | Conditioning Station | Maintenance | | | Filters inspected and cleaned on water circuit | By Curtis. See Work Permit I2021-03-24-1
for details. |
|
2218
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | A contractor on site today for chiller
maintenance. CP2 and CP3 circuit is leaking
and shall not be used. CP1 can still be used. |
|
2219
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 refilled | Tank refilled from 12 in to 25 in using
the new valve. |
|
2228
|
Friday, June 11, 2021, 10:36 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCX33# | TM2 leak check at TCS | Leak checked TM2 service cap at TCS. helium
pressure checked containment box window and
HS cooling lines. No leak on service |
|
2232
|
Thursday, July 08, 2021, 11:36 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#62 | Remotely remove TM4(Ta#62) from SHC to TCS. | Remotely remove TM4 (ta# 62) from SHC to
TCS. The moving is smooth. |
|
2276
|
Wednesday, November 24, 2021, 09:08 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | | Remotely moved TM4 from SHC to TCS | TM4 was moved from the South Hot Cell to
the Conditioning Station. |
|
2277
|
Thursday, November 25, 2021, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#63. | helium pressure test on TM4 HS line at TCS. | Helium pressure test on TM4 HS line at
TCS is done. LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS |
|
2313
|
Monday, April 04, 2022, 21:04 |
Carla Babcock | Conditioning Station | Development | TM2 | | HV testing of IGLIS wires in TM2 | TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring. |
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|
2356
|
Thursday, August 11, 2022, 09:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #44 | HS line helium pressure test. Gas line fitting on module top and gas line leak check. | HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. |
|