1585
|
Monday, July 17, 2017, 17:50 |
Aurelia Laxdal | Conditioning Station | Development | TM3 | No target | Conditioning TM3 |
|
|
|
1587
|
Tuesday, July 18, 2017, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | Conditioning continues today with resistors
removed from the HV cable
Tuesday, July 18, 2017, 16:53: BIAS |
|
|
1878
|
Friday, March 01, 2019, 08:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | Conditioning TM2 without source tray | BIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV |
|
|
1039
|
Monday, August 17, 2015, 10:44 |
Anders Mjos | Conditioning Station | Development | TM2 | LP-FEBIAD Test Target (empty) | Conditioning TM2 Source Tray with FEBIAD test target | TGHT, TBHT, ANODE and COIL power tested
(some amps/volts)
Monday, August 17, 2015, 10:43: BIAS/EL/EE |
|
|
1361
|
Saturday, September 24, 2016, 11:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#34 | Conditioning SiC#34 | Conditioning by ISAC operations
Saturday, September 24, 2016, 11:15:
RGA on for heater conditioning. (kept off |
|
|
1277
|
Wednesday, July 06, 2016, 15:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#33 | Conditioning SiC#33 | Wednesday, July 06, 2016, 15:23:
RGA on. IGs on
Friday, July 08, 2016, 17:07: |
|
|
931
|
Wednesday, June 03, 2015, 13:01 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#31 | Conditioning SiC#31 | PNG1 connected to PNG in service cap
(as per David W)
Wednesday, June 03, 2015, 12:59: |
|
|
1137
|
Wednesday, November 25, 2015, 15:37 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#14 | Conditioning | Wednesday, November 25, 2015, 15:36:
RGA on
Thursday, November 26, 2015, |
|
|
1336
|
Wednesday, August 24, 2016, 14:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#49 | Conditioning | Wednesday, August 24, 2016, 14:42: RGA
on
Wednesday, August 24, 2016, 20:27: |
|
|
2026
|
Thursday, November 07, 2019, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#38 | Conditioing SiC#38 | Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V. |
|
|
365
|
Monday, May 27, 2013, 15:59 |
Bevan Moss | Conditioning Station | Repair | | | Compressor fault | Once again the 7.5 compressors are
tripping due to faults. I believe it is due
to over pressure as a result of the chiller |
|
|
1130
|
Tuesday, November 24, 2015, 14:00 |
chad fisher | South Hot-Cell | Repair | | | Compressible waste sorting. | Residual fields from the remaining compressible
waste were still too high (as far as I'm
concerned) so I have unpacked all compressible |
|
|
1655
|
Thursday, November 09, 2017, 08:46 |
Anders Mjos | Conditioning Station | Repair | | | Communication fiber replaced for HV PLC | After extensive troubleshooting the
communication fiber was found to be damaged
and has been replaced by Gelo. |
|
|
274
|
Saturday, March 23, 2013, 18:14 |
Aurelia Laxdal | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed | After few hickups the TCS was successfuly
commissioned.
In the morning, in the middle of |
|
|
276
|
Monday, March 25, 2013, 10:59 |
Bevan Moss | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed |
|
|
|
273
|
Friday, March 22, 2013, 18:49 |
Aurelia Laxdal | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 1 | Today, the commissioning of the TCS went
well. The water/vacuum interlocks were checked
OK. Then, the TCS was HV conditioned up to |
|
|
989
|
Thursday, July 09, 2015, 13:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | Coil line removal hot cell | coil line has been removed from the hot
cell. Initial decon was performed...after
it still appears to have approximately 200 |
|
|
327
|
Tuesday, April 30, 2013, 07:51 |
chad fisher | South Hot-Cell | Repair | TM3 | | Coil line flow check | David and I checked circuits p and q (the
water cooled coil ciruit) for flow this morning
as, with the source tray still in the module, |
|
|
996
|
Wednesday, July 15, 2015, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | Coil Line replacement | water block jig installed, module side
sealing surfaces re-polished and cleaned.
Coil line inserted into the hot cell and |
|
|
506
|
Thursday, October 17, 2013, 10:24 |
chad fisher | South Hot-Cell | Repair | TM4 | | Coil Line Removal | The containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their |
|