ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1615   Wednesday, September 13, 2017, 16:13 David WangConditioning StationRepairTM3 TCS turbo pumps are started. TCS and TM3 all vacuum pumps are started.
Everything is fine.
  
  1616   Friday, September 15, 2017, 14:12 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the silo
from the conditioning station.
  
  1628   Wednesday, September 27, 2017, 09:02 Travis CaveConditioning StationStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the south hot cell to the conditioning station.
  
  1629   Thursday, September 28, 2017, 10:50 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 window and HS water lines at TCS.  I did helium pressure test on TM2
containment box window and HS  line at TCS.
@ 70psi helium  for 3 minutes, HS:2.2XE-7
  
  1631   Thursday, September 28, 2017, 15:34 Anders MjosConditioning StationDevelopmentTM2 Changes to MP3 startup Due to problems with the regulating
valve WPV1, the VFD (Variable Frequency Drive)
for the pump has been programmed to do a
  
  1632   Thursday, September 28, 2017, 17:44 Anders MjosConditioning StationStandard OperationTM2Ta#54Conditioning Ta#54Thursday, September 28, 2017
Cooling water not yet connected to
TM.
 Ta#54.docxTa#54_BIAS_current_vs_voltage.xlsx 
  1637   Friday, October 06, 2017, 13:25 Anders MjosConditioning StationRepair  HV Test HV was brought up to 70 kV for 1
h without sparks to test the new water installation.
 2017-10-06_HV_Water_Line_Test.xlsx 
  1639   Tuesday, October 10, 2017, 10:45 David WangConditioning StationRepair  Re-route TCS water lines.TCS  cooling polyurethane lines have
been re-routed to solve to HV sparking issue
on old configuration between lines and bais
 8x 
  1645   Wednesday, October 18, 2017, 10:46 Travis CaveConditioning StationStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the south hot cell to the conditioning station.
  
  1647   Thursday, October 19, 2017, 10:11 David WangConditioning StationStandard OperationTM4 Leak check on TM4 HS line at SHC and TCS.Chad and I leak checked TM4 HS line after
new target is installed yesterday. No leak
has been found. Also, I helium pressurized
  
  1649   Thursday, October 19, 2017, 14:20 Anders MjosConditioning StationStandard OperationTM4SiC#37SiC#37 ConditioningThursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46:
 SiC#37_BIAS_current_vs_voltage.xlsxSiC#37.docx 
  1655   Thursday, November 09, 2017, 08:46 Anders MjosConditioning StationRepair  Communication fiber replaced for HV PLC After extensive troubleshooting the
communication fiber was found to be damaged
and has been replaced by Gelo.
  
  1656   Thursday, November 09, 2017, 09:34 David WangConditioning StationStandard OperationTM2Ta#55Leak check on TM2 HS line at SHC and TCS.The TM2 HS line was leak checked at SHC
yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed
by Chad, NO leak.  It was helium pressurized
  
  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCSTCS vacuum system and water system have
been started as well. Everything looks fine.
  
  1658   Thursday, November 09, 2017, 10:39 Anders MjosConditioning StationStandard OperationTM2Ta#55Conditioning Ta#55Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed
  
  1663   Wednesday, November 15, 2017, 08:55 David WangConditioning StationStandard Operation  Install shield plug onto TCS and pumping down TCS.Shielding plug is installed onto TCS. TCS
is being pumped down to keep it under vacuum
for the rest of the year.
  
  1665   Wednesday, December 06, 2017, 09:33 Anders MjosConditioning StationMaintenance  Running chiller for maintenance tech Dakine is on site to do maintenance
on the chiller. The tech requested the chiller
to operate.
  
  1669   Thursday, December 21, 2017, 15:11 Anders MjosConditioning StationMaintenance  Powered down devicesPowered down mechanical pumps in ISAC-I
Experimental hall, vacuum gauge and turbo
pump controllers in ISAC-I B2 North Hot Cell
  
  1673   Tuesday, January 02, 2018, 14:47 Anders MjosConditioning StationStandard Operation  Pumping on secondary vacuumTuesday, January 02, 2018, 14:45: TP1S
started
  
  1674   Tuesday, January 02, 2018, 15:17 Anders MjosConditioning StationMaintenance  Tested chillerTested all 3 compressors and MP2   