ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1486
|
Tuesday, April 11, 2017, 11:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#51 | Electrical Check |
Electrical check performed on TM#2 with Ta#51, see attached PDF. |
Attachment 1: TM2_Ta51_SHC_elec_chk.PDF
|
|
1492
|
Wednesday, April 12, 2017, 13:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check |
Electrical check of TM#3 with no target at the south hot cell |
Attachment 1: TM3_elec_chk_no_tgt.PDF
|
|
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check |
TM#4 with UC#20 has had the electrical check done on it at the south hot cell, see attached for details |
Attachment 1: TM4_UC20_Elec_chk_SHC.PDF
|
|
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check |
Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details. |
Attachment 1: TM4_UC20_Elec_chk_CS_vac.PDF
|
|
1570
|
Wednesday, June 28, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Electrical Check |
Results of electrical check of TM#4 with Ta#52 at the south hot cell and the conditioning station under vacuum. |
Attachment 1: TM4_Ta52_Elec_chk_SHC_CSvac.PDF
|
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check |
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well. |
Attachment 1: TM2_SiC36_SHC_elec_chk.PDF
|
|
Attachment 2: TM2_SiC36_Postbeam_SHC_elec_chk.PDF
|
|
1605
|
Monday, August 28, 2017, 14:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Electrical Check |
The results of the electrical check of TM#4 with UC#21 attached. |
Attachment 1: TM4_UC21_elecchk_SHC.PDF
|
|
1620
|
Thursday, September 21, 2017, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Electrical Check |
Electrical checks of TM#2 with Ta#53 and also with out a target. |
Attachment 1: TM2_Ta53_elec_chk_shc.PDF
|
|
Attachment 2: TM2_Ta53_elec_chk_post_beam_shc.PDF
|
|
Attachment 3: TM2_notgt_elec_chk_shc_09202017.PDF
|
|
1623
|
Friday, September 22, 2017, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check |
Electrical check of TM#2 after the insulator change on thursday september 21. |
Attachment 1: TM2_notgt_elec_chk_shc_09212017.PDF
|
|
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check |
Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details. |
Attachment 1: TM2_Ta54_elec_chk_SHC.PDF
|
|
1644
|
Wednesday, October 18, 2017, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check |
The results of the electrical check of TM#4 with SiC#37, see attached PDF. |
Attachment 1: TM4_SIC37_elec_chk_SHC.pdf
|
|
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check |
The results of the various electrical check done on the target module on November 7th and 8th of 2017. Checks were done with the old Ta#54 target without a target and finally with the new Ta#55 target. See the attached PDF for results. |
Attachment 1: TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdf
|
|
Attachment 2: TM2-no_target-_Electrical_Check_SHC_Nov_2017.pdf
|
|
Attachment 3: TM2-Ta55_Electrical_Check_SHC.pdf
|
|
1707
|
Tuesday, May 01, 2018, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check |
Electrical check of TM#4 with SiC#37 attached post beam. A short was found between the Einzel Lens and Chassis. See attached PDF for details. |
Attachment 1: TM4_electrical_check_SiC37_post_beam.pdf
|
|
1708
|
Thursday, May 03, 2018, 08:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check |
The results of yesterdays electrical check of TM#4 with no target attached. See the attached PDF for details. |
Attachment 1: TM4_Electrical_Check_notarget_May_2_2018.pdf
|
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check |
The results of TM#4 with UC#22 electrical check. See attached PDF. |
Attachment 1: TM4_UC22_Electrical_Check_South_Hot_Cell.pdf
|
|
1747
|
Friday, June 29, 2018, 13:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Nb#8 | Electrical Check |
The results of the various electrical checks performed on the TM#2 with and without the Nb#8 target attached. |
Attachment 1: TM2_elec_chk_steerers_and_lens_062818.pdf
|
|
Attachment 2: TM2_Nb8_elec_chk_shc.pdf
|
|
Attachment 3: TM2_notgt_elec_chk_shc_062918.pdf
|
|
1768
|
Monday, August 20, 2018, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#56 and UC#23 | Electrical Check |
Electrical Checks of the last two targets Ta#56 and UC#23 |
Attachment 1: Electrical_Check_TM4_Ta56_SHC.pdf
|
|
Attachment 2: Electrical_Check_TM2_UC23_CS.pdf
|
|
Attachment 3: Electrical_Check_TM2_UC23_SHC.pdf
|
|
1774
|
Thursday, August 30, 2018, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56, UC#24, and no target | Electrical Check |
Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4. |
Attachment 1: TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf
|
|
Attachment 2: TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf
|
|
Attachment 3: TM#4_UC#24_Electrical_Check_SHC.pdf
|
|
1785
|
Thursday, September 20, 2018, 08:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check |
Results of the electrical check on TM#2 with no target after Chad cleaned out the bolt hole on the module where the target mounts. |
Attachment 1: Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf
|
|
1786
|
Thursday, September 20, 2018, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | Electrical Check |
TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results. |
Attachment 1: Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
|
|