Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 125 of 141  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subjectdown
  1486   Tuesday, April 11, 2017, 11:30 Travis CaveSouth Hot-CellStandard OperationTM2Ta#51Electrical Check

Electrical check performed on TM#2 with Ta#51, see attached PDF.

Attachment 1: TM2_Ta51_SHC_elec_chk.PDF
TM2_Ta51_SHC_elec_chk.PDF
  1492   Wednesday, April 12, 2017, 13:03 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical Check

Electrical check of TM#3 with no target at the south hot cell

Attachment 1: TM3_elec_chk_no_tgt.PDF
TM3_elec_chk_no_tgt.PDF
  1537   Tuesday, May 16, 2017, 14:18 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Electrical Check

TM#4 with UC#20 has had the electrical check done on it  at the south hot cell, see attached for details

Attachment 1: TM4_UC20_Elec_chk_SHC.PDF
TM4_UC20_Elec_chk_SHC.PDF TM4_UC20_Elec_chk_SHC.PDF
  1543   Thursday, May 18, 2017, 11:36 Travis CaveConditioning StationStandard OperationTM4UC#20Electrical Check

Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details.

Attachment 1: TM4_UC20_Elec_chk_CS_vac.PDF
TM4_UC20_Elec_chk_CS_vac.PDF TM4_UC20_Elec_chk_CS_vac.PDF
  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical Check

Results of electrical check of TM#4 with Ta#52 at the south hot cell and the conditioning station under vacuum.

Attachment 1: TM4_Ta52_Elec_chk_SHC_CSvac.PDF
TM4_Ta52_Elec_chk_SHC_CSvac.PDF TM4_Ta52_Elec_chk_SHC_CSvac.PDF
  1589   Tuesday, August 01, 2017, 14:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#36Electrical Check

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

Attachment 1: TM2_SiC36_SHC_elec_chk.PDF
TM2_SiC36_SHC_elec_chk.PDF
Attachment 2: TM2_SiC36_Postbeam_SHC_elec_chk.PDF
TM2_SiC36_Postbeam_SHC_elec_chk.PDF
  1605   Monday, August 28, 2017, 14:40 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Electrical Check

The results of the electrical check of TM#4 with UC#21 attached.

Attachment 1: TM4_UC21_elecchk_SHC.PDF
TM4_UC21_elecchk_SHC.PDF
  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical Check

Electrical checks of TM#2 with Ta#53 and also with out a target.

Attachment 1: TM2_Ta53_elec_chk_shc.PDF
TM2_Ta53_elec_chk_shc.PDF
Attachment 2: TM2_Ta53_elec_chk_post_beam_shc.PDF
TM2_Ta53_elec_chk_post_beam_shc.PDF
Attachment 3: TM2_notgt_elec_chk_shc_09202017.PDF
TM2_notgt_elec_chk_shc_09202017.PDF
  1623   Friday, September 22, 2017, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Electrical check of TM#2 after the insulator change on thursday september 21.

Attachment 1: TM2_notgt_elec_chk_shc_09212017.PDF
TM2_notgt_elec_chk_shc_09212017.PDF
  1626   Tuesday, September 26, 2017, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Electrical Check

Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details.

Attachment 1: TM2_Ta54_elec_chk_SHC.PDF
TM2_Ta54_elec_chk_SHC.PDF
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check

 The results of the electrical check of TM#4 with SiC#37, see attached PDF.

Attachment 1: TM4_SIC37_elec_chk_SHC.pdf
TM4_SIC37_elec_chk_SHC.pdf
  1659   Monday, November 13, 2017, 13:39 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54 and #55Electrical Check

 The results of the various electrical check done on the target module on November 7th and 8th of 2017. Checks were done with the old Ta#54 target without a target and finally with the new Ta#55 target. See the attached PDF for results.

Attachment 1: TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdf
TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdf
Attachment 2: TM2-no_target-_Electrical_Check_SHC_Nov_2017.pdf
TM2-no_target-_Electrical_Check_SHC_Nov_2017.pdf
Attachment 3: TM2-Ta55_Electrical_Check_SHC.pdf
TM2-Ta55_Electrical_Check_SHC.pdf
  1707   Tuesday, May 01, 2018, 13:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check

 Electrical check of TM#4 with SiC#37 attached post beam. A short was found between the Einzel Lens and Chassis. See attached PDF for details.

Attachment 1: TM4_electrical_check_SiC37_post_beam.pdf
TM4_electrical_check_SiC37_post_beam.pdf
  1708   Thursday, May 03, 2018, 08:24 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check

 The results of yesterdays electrical check of TM#4 with no target attached. See the attached PDF for details.

Attachment 1: TM4_Electrical_Check_notarget_May_2_2018.pdf
TM4_Electrical_Check_notarget_May_2_2018.pdf
  1730   Thursday, June 07, 2018, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UC#22Electrical Check

 The results of TM#4 with UC#22 electrical check. See attached PDF.

Attachment 1: TM4_UC22_Electrical_Check_South_Hot_Cell.pdf
TM4_UC22_Electrical_Check_South_Hot_Cell.pdf
  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check

 The results of the various electrical checks performed on the TM#2 with and without the Nb#8 target attached.

Attachment 1: TM2_elec_chk_steerers_and_lens_062818.pdf
TM2_elec_chk_steerers_and_lens_062818.pdf
Attachment 2: TM2_Nb8_elec_chk_shc.pdf
TM2_Nb8_elec_chk_shc.pdf
Attachment 3: TM2_notgt_elec_chk_shc_062918.pdf
TM2_notgt_elec_chk_shc_062918.pdf
  1768   Monday, August 20, 2018, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2Ta#56 and UC#23Electrical Check

 Electrical Checks of the last two targets Ta#56 and UC#23

Attachment 1: Electrical_Check_TM4_Ta56_SHC.pdf
Electrical_Check_TM4_Ta56_SHC.pdf
Attachment 2: Electrical_Check_TM2_UC23_CS.pdf
Electrical_Check_TM2_UC23_CS.pdf
Attachment 3: Electrical_Check_TM2_UC23_SHC.pdf
Electrical_Check_TM2_UC23_SHC.pdf
  1774   Thursday, August 30, 2018, 14:16 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56, UC#24, and no targetElectrical Check

 Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4.

Attachment 1: TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf
TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf
Attachment 2: TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf
TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf
Attachment 3: TM#4_UC#24_Electrical_Check_SHC.pdf
TM#4_UC#24_Electrical_Check_SHC.pdf
  1785   Thursday, September 20, 2018, 08:36 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

 Results of the electrical check on TM#2 with no target after Chad cleaned out the bolt hole on the module where the target mounts.

Attachment 1: Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf
Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf
  1786   Thursday, September 20, 2018, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1Electrical Check

 TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results.

Attachment 1: Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
ELOG V2.9.2-2455