ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated
  
  1318   Friday, August 12, 2016, 10:59 Anders MjosConditioning StationDevelopmentTM3 HV Test with Service Chase Panel removedWater cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode.
 TM3_HV_conditioning_2016-08-12.docxTCS-2016-08-11_TM3_Service_Chase_Panel_Removed.rga 
  1320   Monday, August 15, 2016, 10:15 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Weekly update target hall schedule. Everything
on schedule are finished  on time.  
See attachment.  
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stoppedThe TCS is venting now. The TM3 blue insulator
replacement job will be started soon.
  
  1323   Thursday, August 18, 2016, 10:35 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

    

       
            
  
  1325   Thursday, August 18, 2016, 14:19 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 is now back in the the north east
silo.
  
  1333   Wednesday, August 24, 2016, 10:45 David WangConditioning StationStandard OperationTM2 TM2 vacuum system has been connected at TCSStart of roughing now.   
  1336   Wednesday, August 24, 2016, 14:42 Anders MjosConditioning StationStandard OperationTM2Ta#49ConditioningWednesday, August 24, 2016, 14:42: RGA
on
Wednesday, August 24, 2016, 20:27:
 TCS-2016-08-24_Ta#49.rgaTa#49.docx 
  1337   Thursday, August 25, 2016, 08:36 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS water lline I did a helium pressure test on TM2 HS
water line at TCS. Leak detector base leak
rate only could get to 1.8x e-8 atm.cc/sec
  
  1338   Thursday, August 25, 2016, 08:43 David WangConditioning StationStandard OperationTM2 All TM2 connections to TCS are done.The HV cover is installed. The Faraday
cage at B2 level is locked also.The TCS and
TM2 are still pumping down. Everything is
  
  1339   Thursday, August 25, 2016, 13:59 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)Weekly update schedule.  See attachment
1,2.
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1341   Monday, August 29, 2016, 13:34 David WangConditioning StationStandard OperationTM2 TM2 has been disconnected at TCSI stopped TCS water pumps and vacuum pumps
also.   TM2 and TCS will be vented tomorrow
morning.
  
  1346   Wednesday, September 07, 2016, 11:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the NE Silo to
the conditioning station.
  
  1347   Thursday, September 08, 2016, 16:28 David WangConditioning StationRepairTM3 TM3 blue insulators have been replaced.All TM3 blue insulators except Gas,EL,
and 60 KV common  on top of the module
have been replaced with new designed insulators.
  
  1348   Thursday, September 08, 2016, 16:30 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.start of roughing now.
 start of TCS and TM3 turbo-pumps.
Everything is good so far.
  
  1349   Monday, September 12, 2016, 09:25 David WangConditioning StationRepairTM3 TM3 leak checked at TCSAfter blue insulators replacement, TM3
service cap are leak checked. LD base leak
rate 0.0xe-9 atm.cc/sec. I sprayed lots helium
  
  1350   Tuesday, September 13, 2016, 13:52 Anders MjosConditioning StationStandard OperationTM3 HV Test with new insulators on Service Cap (vacuum to air)Tuesday, September 12, 2016, 10:00: RGA
on

Tuesday, September 13, 2016,
 TM3_HV_conditioning_2016-09-13.docxTCS-2016-09-11_TM3_New_Blue_Insulators.rga 
  1351   Wednesday, September 14, 2016, 11:54 David WangConditioning StationRepairTM3 TM3 is disconnected at TCS. TM3 is disconnected at TCS and ready
to be moved to silo.
  
  1352   Wednesday, September 14, 2016, 13:53 Travis CaveConditioning StationStandard OperationTM3no targetModule moveTM#3, no target, has been moved from the
conditioning station to the north east silo.
  
  1354   Monday, September 19, 2016, 08:28 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 131(Sep-Dec, 2016)Post new  target hall Excel sheet
schedule for beam schedule 131. See attachment
1,2
 Target_Hall_shedule_131__Sep_to_Dec_2016.pdfTarget_Hall_shedule_131__Sep_to_Dec_2016.xlsxTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf 