Monday, May 16, 2016, 13:26, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#48, Conditioning Ta#48
|
Monday, May 16, 2016, 13:20: BIAS/EL/EE 30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping TGHT / TBHT to 580 / 220 A at 2 A/min. IG2 1E-6 / 2E-6 T
Monday, May 16, 2016, 15:45: Paused ramping.
Monday, May 16, 2016, 15:00: Resumed ramping
Monday, May 16, 2016, 16:23: Stopped ramping for the day. TGHT / TBHT at 310 / 220 A. FC at 6.2E-7 A
Tuesday, May 17, 2016, 08:00: Continue ramping.
Wednesday, May 18, 2016, 09:40: BIAS / EL / EE to 35 / 17.5 1.7 kV
Thursday, May 19, 2016, 04:07: BIAS dropped to 0. Likely caused by a power bump.
Thursday, May 19, 2016, 08:05: BIAS returned to 35 kV. Increased EL to 22 kV to maximize FC current.
Thursday, May 19, 2016, 08:11: TBHT to 230 A
Thursday, May 19, 2016, 08:22: Ramping down TGHT / TBHT
Thursday, May 19, 2016, 10:41: BIAS / EL / EE off
Thursday, May 19, 2016, 14:00: TGHT / TBHT off
Friday, May 20, 2016, 14:39: RGA off. |
Friday, May 20, 2016, 08:13, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, I switched off TCS and TM2 water system
|
Disconnected TM2 at TCS(vacuum system still on). Purged all TM2 water lines for helium pressure test. |
Friday, May 20, 2016, 10:38, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, Helium pressure test on TM2 with new Lp Ta target
|
LD base LR: 0.0 X E-9. Base pressure:0.0 X E-4. 70 psi helium. 5 minutes each circuit.
window |
0.0X E-9 |
|
HS |
0.0X E-9 |
|
EE |
0.0X E-9 |
|
Ta+ |
0.0X E-9 |
|
Ta- |
0.0X E-9 |
|
coil1 R-U |
0.0X E-9 |
|
Coil2 P-Q |
5.0X E-9 |
|
Tube- |
5.1X E-9 |
|
Tube+ |
1.1X E-8 |
|
MSP |
3.5X E-9 |
|
The bigger leak found on MSP before was gone. Leak rate are smaller on all circuits comparing to before.
The leak rate on 1 hour total lines test at 70 psi is better also which is 6.6 XE-8 atm.cc/sec this time. |
Tuesday, May 24, 2016, 10:39, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, TM2 and TCS turbo-pumps have been switched off this morning.
|
The TCS and TM2 are still under vacuum without venting |
Tuesday, May 24, 2016, 10:42, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Sep)  
|
Weekly update the TH schedules. See attachments 1, 2,3. |
Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC 
|
Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment
Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2 |
Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS.
|
Bill and Yasmine did the move remotely this afternoon. The move is successful. |
Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started.
|
TM4 and TCS vacuum system are connected. Turbo pumps are started. Everything is fine so far. |
Wednesday, June 08, 2016, 08:25, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#16, Conditioning UC#16 
|
Wednesday, June 08, 2016, 08:15: RGA on
Thursday, June 09, 2016, 09:00: Water on by David. TK2 level dropped by about 1.5 in.
Thursday, June 09, 2016, 10:30: BIAS / EL / EE to 10 / 5 / 0.5 kV
Thursday, June 09, 2016, 10:44: Started heater ramp. TGHT / TBHT to 40 / 20 A at 1 / 0.5 A/min. IG2 vacuum limits 2E-6 / 3E-6 T
Thursday, June 09, 2016, 11:59: Continue ramping to 100 / 50 A.
Friday, June 10, 2016, 08:04: Continue ramping to 300 / 150 A IG2 vacuum limits 1.9E-6 / 2.3E-6 T
Friday, June 10, 2016, 21:32: Stopped ramping at 275 A / 138.5 A
Saturday, June 11, 2016, 11:40: Ramped to 281 A / 140 A
Sunday, June 12, 2016, 08:31: Ramped to 290 A / 145 A
Sunday, June 12, 2016, 08:49: Ramped to 300 A / 150 A
Monday, June 13, 2016, 08:06: Continue ramping to 400 / 200 A
Monday, June 13, 2016, 17:00: TGHT / TBHT at 390 A / 195 A.
Monday, June 13, 2016, 17:17: BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, June 13, 2016, 18:02: Ramping down TGHT / TBHT at 2 / 1 A/min
Monday, June 13, 2016, 21:39: Source off. Water, RGA, vacuum off. |
Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS
|
I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail. |
Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS
|
It is ready for HV conditioning/ heating. |
Thursday, June 09, 2016, 10:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) 
|
Weekly update . |
Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS
|
The TM4 and TCS are vented with argon. |
Wednesday, July 06, 2016, 07:06, David Wang, Conditioning Station, Standard Operation, , , venting TCS with argon.
|
I switched off the vacuum pumps and vented TCS with argon. The TCS will be ready to accept TM2 this afternoon. |
Wednesday, July 06, 2016, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM2, SiC#33, module moved
|
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station. |
Wednesday, July 06, 2016, 14:25, David Wang, Conditioning Station, Standard Operation, TM2, , TCS and TM2 turbo-pumps have been started.
|
The TCS and TM2 are pumping down. |
Wednesday, July 06, 2016, 15:23, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#33, Conditioning SiC#33 
|
Wednesday, July 06, 2016, 15:23: RGA on. IGs on
Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.
Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature
Monday, July 11, 2016, 09:38: BIAS / EL / EE to 10 / 5 / 1 kV
Monday, July 11, 2016, 09:41: BIAS / EL / EE to 20 / 10 / 1.5 kV
Monday, July 11, 2016, 09:47: BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, July 11, 2016, 10:01: BIAS / EL / EE to 40 / 20 / 2.0 kV - one spark at 40 kV
Monday, July 11, 2016, 10:38: BIAS / EL / EE to 45 / 22.5 / 2.0 kV - conditioning from 40 kV
Monday, July 11, 2016, 10:40: BIAS / EL / EE to 45 / 22.5 / 2.3 kV
Monday, July 11, 2016, 12:21 : No sparks for the last 60 min.
Monday, July 11, 2016, 12:21: BIAS / EL / EE off to investigate TGHT / TBHT PS problem (power surge this morning)
Monday, July 11, 2016, 13:07: Power cycled TGHT / TBHT PS. Alarm cleared. Tested both to 10 A |
Friday, July 08, 2016, 08:20, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS
|
I connected TM2 to TCS and started water system. |
Friday, July 08, 2016, 16:56, Anders Mjos, Conditioning Station, Repair, , , VFD21 OL1 fault on Chiller
|
Plant Services group (Tony) will contact a service tech on Monday.
Water system will be switched off over the weekend. |
Tuesday, July 12, 2016, 12:42, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) 
|
Update schedule weekly.Attachment 1,2 |
|