ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1321   Tuesday, August 16, 2016, 11:27 chad fisherSouth Hot-CellMaintenance  South Cell Field ReadingsField readings have been taken at the south
hot cell in preparation for entry into the
cell to fix manipulator.
  
  1323   Thursday, August 18, 2016, 10:35 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

    

       
            
  
  1324   Thursday, August 18, 2016, 13:57 chad fisherSouth Hot-CellMaintenance  Manipulator maitenanceSouth hot cell was entered to check to
replace cable if needed. Wrist cable showed
no signs of fraying or broken strands.
  
  1326   Tuesday, August 23, 2016, 08:05 chad fisherSouth Hot-CellMaintenance  Post Hot Cell Entry Clean-upPlastic has been removed from the floor
and any known active items in the hot cell
moved to the south east corner in an attempt
  
  1330   Wednesday, August 24, 2016, 09:19 chad fisherSouth Hot-CellMaintenance  Anteroom Clean -up paint prepRemaining items from anteroom have been
bagged and removed (save the boot boxes,
1 garbage can and 1 coverall garbage can).
  
  1335   Wednesday, August 24, 2016, 14:37 Anders MjosSouth Hot-CellStandard Operation SiC#33PIE The target was inspected by Anders
and Chad. The target was in good condition
as can be seen on the photos on DocuShare.
  
  1339   Thursday, August 25, 2016, 13:59 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)Weekly update schedule.  See attachment
1,2.
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1340   Thursday, August 25, 2016, 14:25 Travis CaveSpent Target VaultStandard Operation SiC#33Spent Target moveSiC#33 was placed into pail #141 which
in turn was placed into slot 2B of the vault.
I was 295mS/hr upon removal from the south
 Vault_Storage_August_25_2016.pdf 
  1345   Wednesday, September 07, 2016, 11:39 Isaac EarleNorth Hot-CellDevelopment  NHC North / South Wall Gap Measurements Measurements were taken today of
the NHC north/south wall gap at the location
where the NHC/TCS partition wall will be
  
  1353   Thursday, September 15, 2016, 11:05 Isaac EarleNorth Hot-CellDevelopment  NHC / SHC feedthrough panel removedThe sheet metal panel covering the NHC/SHC
feedthrough port was removed today using
a slide-hammer to pull out the concrete anchors
 original_panel.JPGpanel_removed.JPGtemp_panel.JPG 
  1354   Monday, September 19, 2016, 08:28 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 131(Sep-Dec, 2016)Post new  target hall Excel sheet
schedule for beam schedule 131. See attachment
1,2
 Target_Hall_shedule_131__Sep_to_Dec_2016.pdfTarget_Hall_shedule_131__Sep_to_Dec_2016.xlsxTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf 
  1357   Tuesday, September 20, 2016, 11:48 David WangAssembly/Bench TestDevelopment  A silo and blue steel frame are removed out of TH A silo and blue steel frame are removed
out of TH this morning. They are transferred 
through ante room, and moved to experimental
  
  1362   Monday, September 26, 2016, 13:59 Travis CaveSpent Target VaultStandard Operation UC#17Spent Target moveThe spent UC#17 has been moved from the
south hot cell to the spent target vault.
See the attached pdf for details.
 Vault_Storage_September_26_2016.pdf 
  1366   Wednesday, September 28, 2016, 13:47 David WangConditioning StationStandard Operation  TCS pumping down during mini-shut down.A steel plate  is covered on TCS.
TCS roughing pump  is started now. The
TCS will be pumping down during mini-shut
  
  1367   Friday, September 30, 2016, 14:34 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 131(Sep-Dec, 2016) Weekly update TH schedule for beam schedule
131. See attachments 1,2
 Target_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf 
  1371   Wednesday, October 12, 2016, 10:01 David WangConditioning StationStandard Operation  TCS pumps are stoppedArgon venting is started   
  1373   Thursday, October 20, 2016, 10:45 Travis CaveSpent Target VaultStandard Operation Ta#49Spent Target moveTa#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A.
  
  1375   Friday, October 21, 2016, 12:51 chad fisherSouth Hot-CellRepair  Manipulator RepairBroken cable has been replaced however
a cable has hopped some pulleys inside. After
two hours in cell the job was stopped with
  
  1377   Monday, October 24, 2016, 10:10 chad fisherSouth Hot-CellRepair  Manipulator Repair CompleteMaico entered the hot cell and re-strung
the skipped cable back onto the pulleys this
morning. Manipulator is now operational.
  
  1379   Monday, October 24, 2016, 12:22 chad fisherSouth Hot-CellRepair  TM2 Insulator replacementconductor insulators itd0053 and 54 have
been replaced on TM2. All fasteners (1/4-20
x 1 1/4 vented) torqued to 60 in lbs.
  