  581   Monday, January 20, 2014, 13:35 David WangITEStandard OperationTM4 5 shielding blocks had been moved out of ITE5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR
  
  582   Monday, January 20, 2014, 13:38 David WangITEStandard OperationTM4 DISCONNECTED TM4 IN ITE.I DISCONNECTED TM4 IN ITE. ALL WATER LINES
HAD BEEN PURGED OUT WITH PRESSURE AIR.
  
  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
east target station to the south hot cell.
  
  585   Tuesday, January 21, 2014, 14:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 has been moved from the south hot
cell to the north west silo.
  
  619   Wednesday, March 12, 2014, 09:45 Travis CaveITWStandard OperationTM4no targetmodule moveTM#4 has been moved from the north west
silo to the west target station.
  
  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been startedI connected ITW  vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so
  
  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.With TM4 located in ITW, All air to vacuum
seals  on ITW primary and  secondary
vacuum vessels have been leak  checked
 7x 
  629   Monday, March 24, 2014, 12:01 Travis CaveITWStandard OperationTM4no targetmodule moveTM#4 has been moved from the west target
station to the south hot cell.
  
  630   Tuesday, March 25, 2014, 09:11 chad fisherSouth Hot-CellStandard OperationTM4Ta#42Ta#42 install and "new" 9 pinTa#42 has been installed onto TM4. The
"new" 9 pin connector was not an
issue...attually went on better than any
 TM4_20140325_01.jpg 
  631   Tuesday, March 25, 2014, 13:29 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical checkTM#4 was checked electrically with and
without target on it, see attached PDFs for
details.
 TM#4_notarget_electest_SHC.PDFTM#4_Ta42surf_electest_SHC.PDF 
  632   Wednesday, March 26, 2014, 06:57 David WangSouth Hot-CellStandard OperationTM4Ta#42Leak check on TM4 HS water line with new Ta #42 target.Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4
  
  633   Wednesday, March 26, 2014, 08:36 Travis CaveConditioning StationStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved from the
south hot cell to the conditioning station.
  
  634   Thursday, March 27, 2014, 10:47 Travis CaveConditioning StationStandard OperationTM4Ta#42Electrical checkTM#4 with Ta#42 in the conditioning station
under vacuum electrical check.
 TM#4_Ta42surf_electest_CS.PDF 
  635   Monday, March 31, 2014, 13:22 Bevan MossConditioning StationStandard OperationTM4Ta #42HV conditioning TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but
 31032014_TM4_Ta#42_HV_Conditioning.txt31032014_Ta#42_HV_conditioning.JPG 
  636   Wednesday, April 02, 2014, 09:14 Travis CaveITWStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved to the west
target station.
  
  666   Tuesday, May 27, 2014, 10:42 Travis CaveITWStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved from 
the west target station to the south hot
cell.
  
  667   Tuesday, May 27, 2014, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical checkTM#4 electrical check with Ta#42 attached
post beam at the south hot cell.
 TM4_Ta42_elec_chk_SHC_postbeam.PDF 
  668   Wednesday, May 28, 2014, 08:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south hot cell to the south west silo.
  
  725   Thursday, August 07, 2014, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 has been moved from the south west
silo to the south hot cell.
  
  726   Thursday, August 07, 2014, 13:58 David WangSouth Hot-CellStandard OperationTM4UCx #10Leak check on TM4 HS water line with new UCX target.Isaac and I leak checked TM4 HS line with
new UCX target. The leak detector base LR
0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr.
  