2317
|
Thursday, April 28, 2022, 08:16 |
David Wang | ITW | Standard Operation | TM2 | | Annual ITW water signal interlocks check . | Annual ITW water signal interlocks check
was done with TM2 in ITW. Water
signal interlocks on all water circuits related |
|
2325
|
Wednesday, May 25, 2022, 13:23 |
David Wang | ITE | Standard Operation | TM4 | | Annual ITE water signal interlocks. | Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal
interlocks work fine. |
|
2336
|
Wednesday, June 22, 2022, 09:03 |
David Wang | ITE | Standard Operation | TM4 | UCX37# P2N | Remotely removed TM2 from ITE to NHC | TM2 with UCx#37 P2N target was removed
from ITE to NHC yesterday morning. The move
is good. |
|
2337
|
Wednesday, June 22, 2022, 09:14 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC#42 and SiC#43. | Three of TM2 moves related to SiC#42 to SiC #43 target switching job. | Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target |
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|
2356
|
Thursday, August 11, 2022, 09:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #44 | HS line helium pressure test. Gas line fitting on module top and gas line leak check. | HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. |
|
2364
|
Thursday, September 08, 2022, 09:06 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#39 | HS line helium pressure test. | TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. |
|
2374
|
Wednesday, October 05, 2022, 09:31 |
David Wang | Conditioning Station | Standard Operation | TM4 | C#4 | HS line helium pressure test. TM4 with C#4 at TCS. | TM4 HS line helium pressure test is done.
70psi helium pressure@ 3XE-8 atm.cc/sec .
No leak. |
|
2378
|
Monday, October 17, 2022, 08:07 |
David Wang | ITE/ITW | Repair | TM4 | | A small leak on target station secondaryvacuum back up line by ITH MP1S. |
A small leak in target station |
|
2385
|
Thursday, November 03, 2022, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#40 | HS line helium pressure test. TM4 with UCx#40at TCS. | Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line.
No leak. |
|
2401
|
Friday, January 06, 2023, 10:38 |
David Wang | ITW | Standard Operation | TM2 | | ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. | ITW
and TM2 primary and secondary vacuum |
|
2405
|
Tuesday, January 24, 2023, 07:17 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | TM4 water lines helium pressure test 2023. | TM4 water lines helium pressure test was
done yesterday at ITE. All water lines were
air purged one day ahead for the test. |
|
2406
|
Tuesday, January 24, 2023, 07:21 |
David Wang | ITW | Maintenance | | | ITW pit general clean up. | ITW was cleaned with vacuum
canister in Jan 10th. HV cage inside
and blue nylon insulators were wiped. |
|
2407
|
Tuesday, January 24, 2023, 07:26 |
David Wang | Conditioning Station | Standard Operation | | | TH floor moping and garbage collelctions. | Plant group and us finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using. |
|
2408
|
Tuesday, January 24, 2023, 08:46 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | TM4 has been disconnected in ITE. | TM 4 has been disconnected in ITE.
See attachment for disconnection checklist. |
|
2409
|
Tuesday, January 24, 2023, 14:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#41 | TM4 electrical check with and without target at SHC | TM4 electrical check with UCX41target and
without target at SHC. The results
are good. See attachment. |
|
2410
|
Wednesday, January 25, 2023, 06:52 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | ITE primary and secondary vacuum vessel air to vacuum seals leak check. | ITE primary and secondary vacuum vessel
air to vacuum seals leak check was done this
week. One leak has been found on IG1S feed |
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has |
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file. |
|
2413
|
Friday, January 27, 2023, 07:18 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|