Entry  Thursday, April 28, 2022, 08:16, David Wang, ITW, Standard Operation, TM2, , Annual ITW water signal interlocks check . 
Annual ITW water signal interlocks check was done with TM2 in ITW.   Water signal interlocks on all water circuits related to TM and 2A beam
lines in ITW work fine.  
Entry  Wednesday, May 25, 2022, 13:23, David Wang, ITE, Standard Operation, TM4, , Annual ITE water signal interlocks. 
Annual ITE water signal interlocks check is done with Rob Shank. All ITE water signal  interlocks work fine. 
Entry  Wednesday, June 22, 2022, 09:03, David Wang, ITE, Standard Operation, TM4, UCX37# P2N, Remotely removed TM2 from ITE to NHC 
TM2 with UCx#37 P2N target  was removed from ITE to NHC yesterday morning. The move is good. 
Entry  Wednesday, June 22, 2022, 09:14, David Wang, South Hot-Cell, Standard Operation, TM2, SiC#42 and SiC#43. , Three of TM2 moves related to SiC#42 to SiC #43 target switching job.  
Monday morning June 20th: TM2 with SiC # 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target was moved from NHC to SHC due to 10 pin connector guide pin loose issue. The guide pin has to be moved out
in SHC due to NHC manipulator configuration limit .
Entry  Thursday, June 23, 2022, 13:04, David Wang, Conditioning Station, Standard Operation, TM4, Ta#64, helium pressure test on TM4 HS line.  
With Ta#64 installed , TM4 HS line was helium pressure tested at TCS. base leak rate is 0.0XE-9 atm.cc/sec. HS line tested leak rate is 3x E-7 atm.cc/sec
on 5 minutes 50 psi helium testing. Leak check result wasgood at NHC by helium spray method. We decided to apply water to HS and all other water lines
still. The vacuum status is closely being watched. So far, TCS pumping down trend is still good. HS line supply water valve was switched on and off couple
Entry  Thursday, August 11, 2022, 09:10, David Wang, Conditioning Station, Standard Operation, TM4, SiC #44, HS line helium pressure test. Gas line fitting on module top and gas line leak check.  
HS line helium pressure test is done at TCS. No leak. I also leak checked gasline adapter and fittings on TM4 top. No leak.  1/4 copper gas line
between module and ITE was leak checked yesterday. It is good. 
Entry  Thursday, September 08, 2022, 09:06, David Wang, Conditioning Station, Standard Operation, TM2, UCx#39, HS line helium pressure test. 
TM2 with UCX#39 HS line helium pressure test is done at TCS. 70 psi helium 3minutes. No leak @0.0XE-9 atm.cc/sec. 
Entry  Wednesday, October 05, 2022, 09:31, David Wang, Conditioning Station, Standard Operation, TM4, C#4, HS line helium pressure test. TM4 with C#4 at TCS. 
TM4 HS line helium pressure test is done. 70psi helium pressure@ 3XE-8 atm.cc/sec . No leak. 
Entry  Monday, October 17, 2022, 08:07, David Wang, ITE/ITW, Repair, TM4, , A small leak on target station secondaryvacuum back up line by ITH MP1S.  

    
        
            A  small leak in target station secondary vacuum back
up line is observed.  It affects ITH CG2S,CG1S and CG4SA. Current draw on TP1s and TP4S is  getting higher(above 1A) because of it. An internal leak in
ITH MP1S is  suspected by first round investigation. Close watching on system and  further investigation are needed.
        
        
Entry  Thursday, November 03, 2022, 13:15, David Wang, Conditioning Station, Standard Operation, TM2, UCx#40, HS line helium pressure test. TM4 with UCx#40at TCS. 
Helium 70 psi. tested 5minutes at base leak rate 0.9 xE09 atm.cc/sec on HS line.  No leak.
Entry  Friday, January 06, 2023, 10:38, David Wang, ITW, Standard Operation, TM2, , ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.  ITW_vacuum_leak_check_2023.pdf
ITW
 and TM2 primary and secondary vacuum vessel leak check is done. Leak detector is connected to ITW TP1. Base leak rate on leak detector is 0.0 x E-9
atm.cc/sec.   See  attachment for the result.  No big issue. Two old leaks we found last  year at location D and E disappeared in this check.
Entry  Tuesday, January 24, 2023, 07:17, David Wang, ITE, Standard Operation, TM4, UCx#41, TM4 water lines helium pressure test 2023.  TM4_water_lines_helium_presuure_test_2023.pdf
TM4 water lines helium pressure test was done yesterday at ITE. All water lines were air purged one day ahead  for the test. No leak  has been
found on TM4 waterlines during the test. See attachment for detail 
Entry  Tuesday, January 24, 2023, 07:21, David Wang, ITW, Maintenance, , , ITW pit general clean up.  
 ITW  was cleaned with vacuum canister in Jan 10th. HV  cage inside and blue  nylon insulators were wiped.  Garbage inside the pits
were cleaned out.
Entry  Tuesday, January 24, 2023, 07:26, David Wang, Conditioning Station, Standard Operation, , , TH floor moping and garbage collelctions. 
Plant group and us  finished TH floor mopping and garbage collections last Wednesday. Th moping head had 800 count after using. all garbage were
bagged , checked, tagged, and sent to radwaste area. 
Entry  Tuesday, January 24, 2023, 08:46, David Wang, ITE, Standard Operation, TM4, UCx#41, TM4 has been disconnected in ITE.  UCx#41_TM4_disconnection_checklist_in_ITE.pdf
TM 4 has been disconnected in ITE.  See attachment for disconnection checklist.
Entry  Tuesday, January 24, 2023, 14:22, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#41, TM4 electrical check with and without target at SHC TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.
Entry  Wednesday, January 25, 2023, 06:52, David Wang, ITE, Standard Operation, TM4, UCx#41, ITE primary and secondary vacuum vessel air to vacuum seals leak check.  ITE_vacuum_vessel_leak_check_2023..pdf
ITE primary and secondary vacuum vessel air to vacuum seals leak check was done this week. One leak has been found on IG1S feed through to entrance module
surface seal. It explains what we saw on ITE IG1S readings change(from low E-7 torr to 1Xe-6 torr) on December 22, 2022.  This leak seal will be replaced
soon.
Entry  Friday, January 27, 2023, 07:11, David Wang, Crane, Standard Operation, , , Target hall Crane annual inspection has beend done. 
Tom Kauss inspected target hall crane yesterday. The crane works fine. Tom has this inspection record in his file. The inspection tag has been issued.
Entry  Friday, January 27, 2023, 07:15, David Wang, Crane, Standard Operation, , , Target hall Crane annual inspection has beend done. 
Tom Kauss  finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection
tag has been issued for 2023. 
Entry  Friday, January 27, 2023, 07:18, David Wang, Crane, Standard Operation, , , Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02 
Tom Gauss inspected  two target module lifting frames ITA0494-1997-01  and ITA0494-1997-02 yesterday. He certified the use of these two frames for
2023.  Inspection tags have been issued and attached to frames. He has  inspection record on them.  