688
|
Tuesday, June 24, 2014, 15:45 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Ground Electrode and Extraction Electrode dirty after last run |
See attached pdf and DocuShare for more photos. It may be possible to clean some of it from the Ground Electrode. |
Attachment 1: TiC#4_Dirty_GND_and_EE_electrodes.pdf
|
|
|
687
|
Tuesday, June 24, 2014, 15:14 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal |
When the Containment Box was opened today by Chad for a target change, we found the conductor insulator block B (ITD0054) to be broken close to the right TGHT terminal. Chad was nevertheless able to remove the target. See DocuShare and attached file for photos.
An attempt to replace the insulator will be made tomorrow with a spare.
A small sticky piece, likely off plastic material, was found next to the left main source tray insulator. The piece was removed from the Containment Box. See link above and attachment for photos. |
Attachment 1: TiC#4_Broken_Insulator.pdf
|
|
|
686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check |
Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details |
Attachment 1: TM3_TiC4_elec_chk_SHC_postbeam.PDF
|
|
|
685
|
Tuesday, June 24, 2014, 11:33 |
maicodallavalle | Spent Target Vault | Standard Operation | | | F-308 Maintenance |
Five F - 308 flasks containing five ISAC spent targets were moved from the anteroom into the south hot cell area. When the F - 308's were in the south hot cell area the rest of the bolts were installed on all the top covers. All the bolts were torqued and all the cable locks were also installed. All F - 308's were then moved into the Active Services Area. |
|
684
|
Tuesday, June 24, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move |
TM#4 with TiC#4 has been moved from the east target station to the south hot cell. |
|
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. |
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also. |
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data |
Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE receving p+
|
Temp [C] |
Flow [lpm] |
HS |
30.0 |
6.3 |
COIL |
30.2 |
11.6 |
Monday, June 16, 2014, 09:30: p+ off for maintenance day
|
Temp [C] |
Flow [lpm] |
HS |
32.7 |
6.3 |
COIL |
27.7 |
11.6 |
Thursday, June 19, 2014, 16:14: 10 uA p+ on ITW
|
Temp [C] |
Flow [lpm] |
HS |
31.9 |
7.2 |
COIL |
27.6 |
13.1 |
Tuesday, July 08, 2014, 10:32:
Data uploaded to DocuShare |
|
681
|
Thursday, June 12, 2014, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s |
Five targets have been moved from the spent target storage to the mini storage. The targets that were moved are UCx #'s 6,7,8 , SiC #28, and Nb #6. |
Attachment 1: Vault_Storage_June_12_2014.pdf
|
|
Attachment 2: Mini_Vault_Storage_June_12_2014.pdf
|
|
|
680
|
Tuesday, June 10, 2014, 14:02 |
David Wang | ITW | Standard Operation | TM1 | UC9# | TM1 and ITW turbo pumps have been started. |
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on. |
|
679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 moved from the conditioning station to west station. |
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. |
TM1 will be moved to ITW this morning. |
|
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. |
The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig |
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS |
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment |
Attachment 1: 001.JPG
|
|
Attachment 2: 002.JPG
|
|
Attachment 3: 003.JPG
|
|
Attachment 4: 004.JPG
|
|
Attachment 5: 005.JPG
|
|
Attachment 6: 006.JPG
|
|
Attachment 7: TM1_UC9#_E-check_at_CS.pdf
|
|
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started |
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges. |
|
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station. |
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed |
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure test on it at CS later. |
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
TM#1 with UC#9 electrical check see attached pdf for details. |
Attachment 1: TM1_UC9_elec_chk_SHC.PDF
|
|
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed |
UCx #9 has been installed. |
|
670
|
Monday, June 02, 2014, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 with no target has been moved from the north west silo to the south hot cell. |
|
669
|
Friday, May 30, 2014, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#42 | Spent target move |
Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal from the south hot cell. See attached PDF of vault status. |
Attachment 1: Vault_Storage_May_30_2014.pdf
|
|