ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
988
|
Thursday, July 09, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | TM1 | | TM1 in TCS for alpha contamination test | Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water |
|
987
|
Thursday, July 09, 2015, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 has been moved from the south hot
to the north east silo. TM#1 has been moved
from the south west silo to the conditioning |
|
986
|
Wednesday, July 08, 2015, 14:48 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Water block jig has been removed. Stuck
source tray side water block jig component
has been removed. An attempt was made to |
|
985
|
Wednesday, July 08, 2015, 14:24 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 pressure bubble test on RU water blocks. | July-06, 2015. Chad , Grant and I did the
bubble test on R,U water blocks. We suspected
the leak on the R,U circuit is from C seals |
|
984
|
Wednesday, July 08, 2015, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | leak check coil line(R,U) on TM2 at SHC | Chad and I leak checked coil line(R,U)
on TM2 at SHC yesterday. The leak detector
was pumped down to 0.0Xe-9 atm.cc/sec before |
|
983
|
Wednesday, July 08, 2015, 12:18 |
chad fisher | South Hot-Cell | Repair | TM2 | | R U Coil line Removal | R U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module. |
|
982
|
Tuesday, July 07, 2015, 12:12 |
David Wang | Conditioning Station | Repair | | | CS TP1S replacement | CS TP1S had been replaced with a new TP-301
pump this morning.The old pump was broken
last week. |
|
981
|
Tuesday, July 07, 2015, 10:50 |
Anders Mjos | Conditioning Station | Development | | | EPICS migration update - archiver |
The archiver is now merged with
ISAC - data available under Utilities
- Archiver Retrieval
Old |
|
980
|
Friday, July 03, 2015, 13:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | Hot Cell/ Module Fields | Field measured at block "R" through
tool port with pole monitor is 6.65 mSv/H.
There are three air hoods and two |
|
979
|
Friday, July 03, 2015, 11:33 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Coil Leak Progress | First thing this morning the hot cell was
"cleaned up" in preparation for
the return of TM2 for attempted verification |
|
978
|
Friday, July 03, 2015, 09:41 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - July 24 2015 | Updated the schedule before the weekend
2015-07-03. See attachment 1,2
Updated the schedule according to |
|
977
|
Friday, July 03, 2015, 09:27 |
Anders Mjos | Conditioning Station | Development | | | Controls working on access control in EPICS | Some reboots will be done. |
|
976
|
Friday, July 03, 2015, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
975
|
Thursday, July 02, 2015, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#12 | Spent target moved | UC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a |
|
974
|
Thursday, July 02, 2015, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the south west silo. |
|
973
|
Thursday, July 02, 2015, 10:22 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TP1S failed | See e-fault 8233. Edi assisted in
diagnosing the problem. The pump will have
to be replaced. |
|
972
|
Tuesday, June 30, 2015, 15:53 |
David Wang | Conditioning Station | Development | TM2 | | leak on TM2 at CS | I leak checked TM2 at CS this afternoon
which including air to vacuum check on service
cap and helium pressure test on water lines. |
|
971
|
Tuesday, June 30, 2015, 15:41 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW this morning. | TM1 was disconnected in ITW this
morning. The ITW was vented with argon last
night. |
|
970
|
Tuesday, June 30, 2015, 12:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#12 | UCx #12 Removal | UCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly |
|
969
|
Tuesday, June 30, 2015, 11:27 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module moved | TM#1 with UC#12 has been moved from the
west station to the south hot cell. |
|