ID Date Author Category Type Module Target/Number Subject Text Attachments
  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure:
  
  707   Thursday, July 17, 2014, 09:29 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43module moveTM#1 with Ta#43 has been moved from the
south hot cell to conditioning station.
  
  706   Wednesday, July 16, 2014, 14:28 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43Electrical checkTM#1 with Ta#43 electrical check see attached
PDF.
 TM1_Ta43_elec_chk_shc.PDF 
  705   Wednesday, July 16, 2014, 13:59 chad fisherSouth Hot-CellStandard OperationTM3SiC#30Sic#30 installJust some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided
  
  704   Wednesday, July 16, 2014, 13:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#9UCx#9 off Ta onThe UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current
  
  703   Wednesday, July 16, 2014, 13:02 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical checkElectrical check of the TM#1 with UC#9
post beam at the south hot cell.
 TM1_UC9_Elecchk_postbeam.PDF 
  702   Wednesday, July 16, 2014, 11:28 David WangITWStandard OperationTM1 TM1 had been dsiconnected in ITW.The TM1 and ITW  were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning.
  
  701   Wednesday, July 16, 2014, 10:32 Travis CaveSouth Hot-CellStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
west target station to the south hot cell.
  
  700   Tuesday, July 08, 2014, 09:57 David WangITEStandard OperationTM3 5 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  698   Wednesday, July 02, 2014, 14:29 David WangITEStandard Operation  Reconnected TM3 in ITE.I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical
  
  697   Wednesday, July 02, 2014, 09:02 Travis CaveITEStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
conditioning station to the east target station.
  
  696   Friday, June 27, 2014, 11:26 Anders MjosSouth Hot-CellStandard OperationTM3 Ground Electrode Cleaned

    

       
            
 TM3_GND_Electrode_Cleaning.pdf 
  695   Friday, June 27, 2014, 10:16 David WangConditioning StationStandard OperationTM3  TM3 HS water lines helium pressure test. at CSTM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4
  
  694   Thursday, June 26, 2014, 14:18 Travis CaveConditioning StationStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station.
  
  693   Thursday, June 26, 2014, 11:15 Travis CaveSouth Hot-CellStandard OperationTM3SiC#30Electrical checkElectrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with
 TM3_SiC30_elecSHC.PDFTM3_elecchkaftclean.PDF 
  692   Thursday, June 26, 2014, 10:57 David WangSouth Hot-CellStandard OperationTM3 Leak check on TM3 HS water line with new target. installed.Chad and I leak checked the TM3 HS water
line with new target installed.  No
leak has been found during the check. Leak
  
  691   Wednesday, June 25, 2014, 13:46 Travis CaveSouth Hot-CellRepairTM3no targetElectrical checkElectrical check of TM#3 after the insulator
repair. See attached PDF for details.
 TM3electestsinsulrepair.PDF 
  690   Wednesday, June 25, 2014, 12:55 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Object - possibly cable tie found in Containment Box See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare.
 TiC#4_Cable_Tie.pdf 
  689   Wednesday, June 25, 2014, 12:49 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminal

    

       
            
 ITD0052C_revB.pdf 