  RH-ISAC, Page 110 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subject Text Attachments
  573   Thursday, December 05, 2013, 14:55 David WangSouth Hot-CellStandard OperationTM4 Leak check on TM4 target heat shieldChad and I leak checked TM4 heat shied
water circuit at SHC. The pumping down was
very good.Base leak rate 0.0xe-9 atm.cc/sec.
  
  572   Thursday, December 05, 2013, 12:51 Travis CaveSouth Hot-CellStandard OperationTM4UC#8 and no targetElectrical checkElectrical check was done on TM#4 without
a target and with the UC#8 target on see
attached PDF for results.
 TM#4_UC8_electest_SHC.PDFTM#4_notarget_electest_SHC.PDF 
  571   Thursday, December 05, 2013, 12:04 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
south hot cell to the east target station.
  
  570   Wednesday, December 04, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Electrical checkElectrical check of TM#4 with Ta#41 post
beam at the south hot cell. See PDF for details
 TM#4_Ta41_electest_SHC_PostBeam.PDF 
  569   Wednesday, December 04, 2013, 13:57 chad fisherSouth Hot-CellStandard OperationTM4Ta #47Ta #47 Removed - broken boltTa #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with
  
  568   Wednesday, December 04, 2013, 11:15 David WangITERepairTM4 New bolts are installed on ITE TP3.I installed 8 new bolts(3/8-16 UNC x1.25 
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back
  
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  566   Wednesday, December 04, 2013, 10:44 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has moved to the south
hot cell, the move it self was uneventful
but, the fields on the module are extremely
  
  565   Tuesday, December 03, 2013, 14:14 Bevan MossConditioning StationStandard OperationTM2 HV conditioning  It was attempted to HV condition
TM2 to 55kV and leave it operating there
for an hour to demonstrate stability. Unfortunately
 TM2_conditioning_03122013.JPG 
  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks offThe blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level
  
  563   Tuesday, December 03, 2013, 09:58 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITW to block storage area.I moved 5 shielding blocks from ITW to
block storage area.
  
  562   Monday, December 02, 2013, 11:29 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the northeast silo.
  
  561   Friday, November 29, 2013, 11:57 Bevan MossSouth Hot-CellRepairTM3 Steerer short investegation

    

       
            
  
  560   Friday, November 29, 2013, 11:54 chad fisherSouth Hot-CellRepairTM3 Steerer short investegationUsing in cell camera and transit the suspect
line on the steerers was inspected as best
as possible. An existing photo of the complete
 TM3_20131129_Steerer_1.jpgTM3_20131129_Steerer_2.jpgTM3_20131129_Steerer_3.jpg 
  559   Wednesday, November 27, 2013, 15:24 Bevan MossSouth Hot-CellMaintenanceTM3 Wiring Harness Electrical Test Maico removed the containment box
today allow Travis and I to further test
the wiring harness. I disconnected the junction
 IMG_1269.JPG 
  558   Wednesday, November 27, 2013, 12:50 Bevan MossSouth Hot-CellStandard OperationTM3 Ground devices wiring check Travis and I completed an electrical
check on the wiring harness for the devices
on the ground plane. All lines passed 500V
  
  557   Tuesday, November 26, 2013, 14:10 Travis CaveCraneMaintenance  Thermal relay replacedThe bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local)
  
  556   Monday, November 25, 2013, 11:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the north east silo to the south hot cell.
  
  555   Friday, November 22, 2013, 10:29 Travis CaveSpent Target VaultStandard Operation NiO#2Spent target moveNiO#2 has been moved from the south hot
cell into spent target storage. It was placed
in pail 111 in slot 3C of the storage vault.
 Vault_Storage_November_22_2013.pdf 
  554   Thursday, November 21, 2013, 12:12 Anders MjosSouth Hot-CellStandard OperationTM3NiO#2End of beam target inspection - ANODE does not hold 250VThe target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found
  