  568   Wednesday, December 04, 2013, 11:15 David WangITERepairTM4 New bolts are installed on ITE TP3.I installed 8 new bolts(3/8-16 UNC x1.25 
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back
  
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  566   Wednesday, December 04, 2013, 10:44 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has moved to the south
hot cell, the move it self was uneventful
but, the fields on the module are extremely
  
  565   Tuesday, December 03, 2013, 14:14 Bevan MossConditioning StationStandard OperationTM2 HV conditioning  It was attempted to HV condition
TM2 to 55kV and leave it operating there
for an hour to demonstrate stability. Unfortunately
 TM2_conditioning_03122013.JPG 
  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks offThe blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level
  
  563   Tuesday, December 03, 2013, 09:58 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITW to block storage area.I moved 5 shielding blocks from ITW to
block storage area.
  
  562   Monday, December 02, 2013, 11:29 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the northeast silo.
  
  561   Friday, November 29, 2013, 11:57 Bevan MossSouth Hot-CellRepairTM3 Steerer short investegation

    

       
            
  
  560   Friday, November 29, 2013, 11:54 chad fisherSouth Hot-CellRepairTM3 Steerer short investegationUsing in cell camera and transit the suspect
line on the steerers was inspected as best
as possible. An existing photo of the complete
 TM3_20131129_Steerer_1.jpgTM3_20131129_Steerer_2.jpgTM3_20131129_Steerer_3.jpg 
  559   Wednesday, November 27, 2013, 15:24 Bevan MossSouth Hot-CellMaintenanceTM3 Wiring Harness Electrical Test Maico removed the containment box
today allow Travis and I to further test
the wiring harness. I disconnected the junction
 IMG_1269.JPG 
  558   Wednesday, November 27, 2013, 12:50 Bevan MossSouth Hot-CellStandard OperationTM3 Ground devices wiring check Travis and I completed an electrical
check on the wiring harness for the devices
on the ground plane. All lines passed 500V
  
  557   Tuesday, November 26, 2013, 14:10 Travis CaveCraneMaintenance  Thermal relay replacedThe bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local)
  
  556   Monday, November 25, 2013, 11:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the north east silo to the south hot cell.
  
  555   Friday, November 22, 2013, 10:29 Travis CaveSpent Target VaultStandard Operation NiO#2Spent target moveNiO#2 has been moved from the south hot
cell into spent target storage. It was placed
in pail 111 in slot 3C of the storage vault.
 Vault_Storage_November_22_2013.pdf 
  554   Thursday, November 21, 2013, 12:12 Anders MjosSouth Hot-CellStandard OperationTM3NiO#2End of beam target inspection - ANODE does not hold 250VThe target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found
  
  553   Wednesday, November 20, 2013, 13:52 Bevan MossConditioning StationStandard OperationTM2 HV testing of TM2 HV testing without the cover continued
today. With the EINZEL lens at 30kV the target
module was able to achieve 58.7kV. At this
 20112013_HV_conditioning_TM2.JPG20112013_TM2_No_source_tray_HV_Test_no_cover.txt 
  552   Wednesday, November 20, 2013, 09:52 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the north east silo.
  
  551   Wednesday, November 20, 2013, 08:50 chad fisherSouth Hot-CellStandard OperationTM3NiO#2NiO#2 removedNiO#2 has been removed from TM3  TM3_20131120.jpgTM3_20131120_2.jpg 
  550   Tuesday, November 19, 2013, 16:55 Bevan MossConditioning StationStandard OperationTM2 HV conditioning HV conditioning of TM2 continued
today. At ~53.5kV the module started to spark
externally to the HV cover. This is the first
 external_sparking.JPG19112013_HV_conditioning_TM2.JPG19112013_TM2_No_source_tray_HV_Test_no_cover.txt19112013_TM2_No_source_tray_HV_Test.txt 
  549   Tuesday, November 19, 2013, 14:24 David WangITERepair  ITE TP3Hi
all, The old  ITE  TP3 pump is
moved out and the new pump is  in
  