37
|
Tuesday, October 25, 2011, 08:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Electrical check | TM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground) |
|
|
36
|
Wednesday, October 05, 2011, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#2 | Spent target move | The spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal |
|
|
35
|
Tuesday, October 04, 2011, 14:13 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Move ot TM#1 | Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station. |
|
|
34
|
Monday, October 03, 2011, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TaC#1 | Electrical check | TM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all |
|
|
33
|
Monday, October 03, 2011, 11:54 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#2 - TaC#1 | Target change UCx#2-TaC#1 | UCx#2 has been removed from Tm1 and put
in a bucket with a slow argon feed and a
lid placed lossely on top. |
|
|
32
|
Monday, October 03, 2011, 11:00 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#2 | Move from west station to south hot cell | TM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well. |
|
|
31
|
Thursday, September 29, 2011, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#36 | Spent target move | The spent Ta#36 has been moved to the storage
vault. It was placed in pail #90, and placed
into slot 3B, it was 111mSv/hr upon removal |
|
|
30
|
Wednesday, September 28, 2011, 11:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | TM#4 moved from South Hot Cell to to North East Silo. | TM#4 moved from South Hot Cell to to North
East Silo, move went well. |
|
|
29
|
Wednesday, September 28, 2011, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#36 | Ta#36 Removal | Ta#36 was removed from target module 4.
The standard, unexplained, un-investegated,
un-resolved "arc" were again present |
|
|
28
|
Wednesday, September 28, 2011, 09:07 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#36 | Move of TM#4 from East target station to south hot cell. | Move of TM#4 with Ta#36 from East target
station to south hot cell, move went well. |
|
|
27
|
Wednesday, September 14, 2011, 10:32 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#37 | Spent target move | Ta#37 has been moved from the south hot
cell into the storage vault. The target is
in pail #89 and in spot 6A in the vault. |
|
|
26
|
Thursday, September 01, 2011, 09:11 |
Don Jackson | ITW | Standard Operation | TM1 | UCx#2 | Argon Venting West Station | West target station is setup to use argon
for tank venting. There is 1200 PSI
remaining on argon bottle in electrical room. |
|
|
25
|
Wednesday, August 24, 2011, 17:11 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Leak Check, HV conditioning and Module Move | Today a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps |
|
|
24
|
Wednesday, August 24, 2011, 16:35 |
Bevan Moss | South Hot-Cell | Repair | TM1 | UCx#2 | Move, inspection and repair | On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump |
|
|
23
|
Friday, August 19, 2011, 14:52 |
Bevan Moss | Conditioning Station | Repair | TM1 | UCx#2 | Leak Check | A
leak check was performed on the module when
it was in the conditioning station today. |
|
|
22
|
Thursday, August 18, 2011, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Pump Down | Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52 |
|
|
21
|
Thursday, August 18, 2011, 14:09 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | UCx#2 | Leak and Electrical Check plus Remote Move to Conditioning Station | TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a leak |
|
|
20
|
Thursday, August 18, 2011, 13:12 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #2 | UCx #2 Installation | UCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between |
|
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
|
18
|
Wednesday, August 03, 2011, 11:24 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#37 | Module move | TM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well. |
|