2748
|
Tuesday, January 14, 2025, 10:00 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#47 | after operation electrical check, Tm3 UCx 47 | TM3 UCx#47 after operation electrical check
is done at SHC. The result is normal. See
attachment. |
|
|
2747
|
Monday, January 13, 2025, 10:36 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | module disconnection | TM3 with spent target UCx#47 was
disconnected in ITE and will be moved to
SHC. |
|
|
2746
|
Monday, January 13, 2025, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#46 | Spent Target Move | UC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault
|
|
|
2745
|
Thursday, January 09, 2025, 11:46 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | SMP is under vacuum for TM4 storage during shut down. | SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down. |
|
|
2744
|
Thursday, January 09, 2025, 11:08 |
David Wang | Facilities | Maintenance | | | ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings | ITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this |
|
|
2743
|
Wednesday, January 08, 2025, 07:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 removal | UCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues. |
|
|
2742
|
Tuesday, January 07, 2025, 12:05 |
David Wang | ITE | Standard Operation | TM3 | UCx #47 | ITE primary and secondary vacuum vessel leak check for 2025 shut down | ITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak. The TM3 waterlines helium |
|
|
2741
|
Monday, January 06, 2025, 08:38 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | module disconnection | TM4 WITH UCx#46 was disconnected
in 2025-01-02 in ITW. Forms attached. |
|
|
2740
|
Friday, January 03, 2025, 12:34 |
Frank Song | 5 Shielding Blocks | Maintenance | | UCx#47 | shielding blocks moving | Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations |
|
|
2739
|
Friday, January 03, 2025, 10:41 |
David Wang | ITW | Standard Operation | TM4 | UCX46 | ITW primary and secondary vacuum vessel leak check for 2025 shut down | ITW primary and secondary vacuum vessel
leak check for 2025 shut down has been
done. Also,TM4 internal water line helium |
|
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
|
2737
|
Wednesday, December 18, 2024, 14:17 |
Adam Newsome | Pail Handling Tool | Maintenance | | | Pail Handling Tool - Inspection | An informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main |
|
|
2736
|
Wednesday, December 18, 2024, 12:18 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Five Pails Transferred from Main Vault to Mini Vault | Five pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present |
|
|
2735
|
Monday, December 09, 2024, 13:10 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM3 | UCx#47 | shielding blocks transfer | 5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving. |
|
|
2734
|
Thursday, December 05, 2024, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#68 | Spent target move - Ta#68 in Pail 300 | Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h |
|
|
2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 | December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane
Hot Cell Prep: |
|
|
2732
|
Wednesday, December 04, 2024, 14:30 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Ta#68 PIE | Abstract:
This target has seen some irregular
beam patterns |
32x |
|
2731
|
Wednesday, December 04, 2024, 10:40 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - SHC to silo | TM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. |
|
|
2730
|
Wednesday, December 04, 2024, 09:00 |
David Wang | Facilities | Standard Operation | TM2 | | all water lines on TM2 have been purged. | all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year |
|
|
2729
|
Wednesday, December 04, 2024, 08:05 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | Module Connection | TM3 with new target UCx#47 was connected
in ITE right after be moved from TCS. |
|