ID Date Author Category Type Module Target/Number Subject Text Attachments
  2368   Wednesday, September 28, 2022, 12:58 Matthew GareauNorth Hot-CellRepair  Chad repaired the right operator side manipulatorOn 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears
 IMG_20220926_091024~2.jpgIMG_20220926_091040.jpgIMG_20220926_091047.jpgIMG_20220926_091153.jpg 
  2367   Thursday, September 15, 2022, 11:25 Travis CaveSpent Target VaultStandard Operation UC#38Spent Target Move The spent target UC#38 was packed
into pail #274 and placed in spot 1A of the
vault. It was 33.3mSv/hr when removed from
 Target_Index_2022-09-15.pdf 
  2366   Wednesday, September 14, 2022, 13:45 Adam NewsomeSpent Target VaultDevelopment  Storage Vault: cable replaced and e-chain upgradeThe motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran
 PXL_20220914_183329159.jpg 
  2365   Tuesday, September 13, 2022, 14:10 Frank SongITWStandard OperationTM2UCx#39Module Connection TM2 with UCx#39 is connected in ITW.  TM2_with_UCx#39_connection_in_ITW.png 
  2364   Thursday, September 08, 2022, 09:06 David WangConditioning StationStandard OperationTM2UCx#39HS line helium pressure test.TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. 
  
  2363   Thursday, September 08, 2022, 07:20 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check An electrical check was done on NHC
yesterday.
 TM2_with_UCx#39_E_Check.png 
  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection  An electrical was done on the NHC
for TM2 with spent Target UCx#38 on
 TM2_electrical_check_on_NHC_with_spent_UCx38_on.png 
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection TM2 with Target UCx38 was disconnected
in ITW and moved to NHC
 TM2_with_UCx38_disconnection_in_ITW.png 
  2360   Tuesday, August 23, 2022, 11:33 Carla BabcockITERepair  ITE:ANODE swapped with TCS:ANODEITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room:
  
  2359   Tuesday, August 23, 2022, 10:51 Carla BabcockITERepairTM4SiC#44TBHT to HV common short on SiC#44-TM4TM4 with SiC#44 installed developed a short
TBHT to HV common during its first heating
in ITE. Was fine before installation. Now
  
  2358   Thursday, August 18, 2022, 10:41 Frank SongITE/ITWStandard OperationTM4SiC#44TM4 with SiC#44 connection in ITE TM4 with target SiC#44 was connected
in ITE on Tuesday.
 TM4_with_SiC#44_connection_in_ITE.jpg 
  2357   Thursday, August 18, 2022, 10:13 Travis CaveSpent Target VaultStandard Operation Ta#64Spent Target Move The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C
 Target_Index_2022-08-18.pdf 
  2356   Thursday, August 11, 2022, 09:10 David WangConditioning StationStandard OperationTM4SiC #44HS line helium pressure test. Gas line fitting on module top and gas line leak check. HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. 
  
  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check  TM4 with Sic#44 installed and had
an electrical / leak check at NHC. 
 TM4_with_Sic#44_eletrical_and_leak_check.jpg 
  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC An electrical check made at NHC right
after TM4 moving from ITE.
 tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg 
  2353   Tuesday, August 09, 2022, 12:19 Frank SongITEStandard OperationTM4Ta#64TM4 with Ta#64 disconnection in ITE TM4 with Ta#64 has been disconnected
in ITE.
 TM4_with_Ta#64_disconnection_in_ITE.jpeg 
  2352   Friday, July 29, 2022, 12:05 Carla BabcockNorth Hot-CellRepairTM2UCx#38Repair of UCx#38 EE short in ante roomUCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in
 20220726_111649.jpg20220726_111641.jpg 
  2351   Thursday, July 28, 2022, 10:47 Travis CaveSpent Target VaultStandard Operation SiC#43Spent Target Move The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See
 Target_Index_2022-07-28.pdf 
  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection TM2 with Target UCx#38 was connected
in ITW.
 TM2_with_UCx38_connection_at_ITW.jpg 
  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections A standard electrical check was done
for TM2 after the short issue be fixed.
 TM2_with_UCx38_echeck_on_NHC.jpg 