2368
|
Wednesday, September 28, 2022, 12:58 |
Matthew Gareau | North Hot-Cell | Repair | | | Chad repaired the right operator side manipulator | On 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears |
|
2367
|
Thursday, September 15, 2022, 11:25 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38 | Spent Target Move | The spent target UC#38 was packed
into pail #274 and placed in spot 1A of the
vault. It was 33.3mSv/hr when removed from |
|
2366
|
Wednesday, September 14, 2022, 13:45 |
Adam Newsome | Spent Target Vault | Development | | | Storage Vault: cable replaced and e-chain upgrade | The motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran |
|
2365
|
Tuesday, September 13, 2022, 14:10 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | Module Connection | TM2 with UCx#39 is connected in ITW. |
|
2364
|
Thursday, September 08, 2022, 09:06 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#39 | HS line helium pressure test. | TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. |
|
2363
|
Thursday, September 08, 2022, 07:20 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check | An electrical check was done on NHC
yesterday. |
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection | An electrical was done on the NHC
for TM2 with spent Target UCx#38 on |
|
2361
|
Tuesday, September 06, 2022, 13:58 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | module disconnection | TM2 with Target UCx38 was disconnected
in ITW and moved to NHC |
|
2360
|
Tuesday, August 23, 2022, 11:33 |
Carla Babcock | ITE | Repair | | | ITE:ANODE swapped with TCS:ANODE | ITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room: |
|
2359
|
Tuesday, August 23, 2022, 10:51 |
Carla Babcock | ITE | Repair | TM4 | SiC#44 | TBHT to HV common short on SiC#44-TM4 | TM4 with SiC#44 installed developed a short
TBHT to HV common during its first heating
in ITE. Was fine before installation. Now |
|
2358
|
Thursday, August 18, 2022, 10:41 |
Frank Song | ITE/ITW | Standard Operation | TM4 | SiC#44 | TM4 with SiC#44 connection in ITE | TM4 with target SiC#44 was connected
in ITE on Tuesday. |
|
2357
|
Thursday, August 18, 2022, 10:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#64 | Spent Target Move | The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C |
|
2356
|
Thursday, August 11, 2022, 09:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #44 | HS line helium pressure test. Gas line fitting on module top and gas line leak check. | HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. |
|
2355
|
Wednesday, August 10, 2022, 08:10 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#44 | electrical and leak check | TM4 with Sic#44 installed and had
an electrical / leak check at NHC. |
|
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC | An electrical check made at NHC right
after TM4 moving from ITE. |
|
2353
|
Tuesday, August 09, 2022, 12:19 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | TM4 with Ta#64 disconnection in ITE | TM4 with Ta#64 has been disconnected
in ITE. |
|
2352
|
Friday, July 29, 2022, 12:05 |
Carla Babcock | North Hot-Cell | Repair | TM2 | UCx#38 | Repair of UCx#38 EE short in ante room | UCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in |
|
2351
|
Thursday, July 28, 2022, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#43 | Spent Target Move | The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See |
|
2350
|
Wednesday, July 27, 2022, 08:11 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | Module Connection | TM2 with Target UCx#38 was connected
in ITW. |
|
2349
|
Tuesday, July 26, 2022, 13:50 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | TM2 electrical check with Target and No external Connections | A standard electrical check was done