  1948   Tuesday, July 09, 2019, 09:15 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetConditioning TM4 w/ new ST up to 45kVLeft TM4 at 40kV overnight with no previous
heating. There was only one real spark which
turned off TP2 but ops turned it back on.
  
  1947   Monday, July 08, 2019, 14:56 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetFirst TM4 conditioning with new source trayRamping up TM4 with new source tray in.
Current condition: new source tray but no
water running in lines B, D or window. Multipin
  
  1946   Thursday, July 04, 2019, 08:57 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum system installed July 3:
- Assembled exhaust line flexible
hose and fittings as per ISK0529 Rev D then
 20190703_122635.jpg20190703_122646.jpg20190703_122702.jpg 
  1945   Friday, June 21, 2019, 07:16 David WangSouth Hot-CellDevelopmentTM4 TM4 new source tray leak check at SHC.New source tray was installed on TM4 yesterday.
LD was used to pump down all water lines.
Tube heater +D circuit has a big leak 
  
  1944   Thursday, June 20, 2019, 15:09 Isaac EarleSafe Module ParkingDevelopment  SMP motor wiring inspected by electricianThe AC wiring for the SMP motor was inspected
by Randy Boehm (TRIUMF electrician) as recommended
by Franco Mammarella (TRIUMF electrical engineer). 
  
  1943   Friday, June 14, 2019, 08:15 David WangITEStandard OperationTM2 5 shielding blocks are moved to ITE. ITE is configured to take proton beam.   
  1942   Thursday, June 13, 2019, 10:55 David WangConditioning StationRepairTM4 TM4 HV test at TCS without source tray.I brought up TCS bias to 57.5 KV on TM4
without source tray at TCS. It was kept at
this level about 1.0 hours. Some intermediate
  
  1941   Thursday, June 13, 2019, 09:09 Travis CaveSouth Hot-CellStandard OperationTM4no target and no source trayModule move TM#4 has been moved from the conditioning
station to the south hot cell. The module
has no source tray.
  
  1940   Wednesday, June 12, 2019, 08:56 Carla BabcockConditioning StationMaintenanceTM4No targetMore TM4 conditioning without source trayThe conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit
  
  1939   Monday, June 10, 2019, 18:12 Carla BabcockConditioning StationMaintenanceTM4No targetAttempt to push bias > 56kVMonday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After
 Screenshot_-_06102019_-_06_43_17_PM.png 
  1938   Monday, June 10, 2019, 16:22 Carla BabcockConditioning StationMaintenanceTM4No targetRamping V on TM4, no HV cover in THRamped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV
  
  1937   Monday, June 10, 2019, 14:13 Travis CaveSpent Target VaultStandard Operation  Old TM#4 source tray moved The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high
  
  1936   Monday, June 10, 2019, 08:26 Carla BabcockConditioning StationMaintenanceTM4No targetRamping voltage on TM4 w/o source trayTM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC
  
  1935   Friday, June 07, 2019, 13:11 David WangConditioning StationDevelopmentTM4 TCS and TM4. TM4 has been connected at TCS for HV test.
TCS water system and vacuum pumps are switched
on. 
  
  1934   Friday, June 07, 2019, 08:56 Travis CaveConditioning StationStandard OperationTM4no targetModule move TM#4 has been moved from the south
hot cell to the conditioning station.
  
  1933   Thursday, June 06, 2019, 10:01 Travis CaveSouth Hot-CellStandard OperationTM4no target, no source TrayElectrical Check Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered
 TM4_Electrical_Check_No_source_Tray_SHC_June_6_2019.pdf 
  1932   Tuesday, June 04, 2019, 08:46 David WangITEStandard OperationTM2 ITE water signal interlock check.ITE water signal interlock check is done.
Everything is good. Coil 2   circuit
no longer used in ITE . PQRU are looped as
  
  1931   Friday, May 24, 2019, 09:11 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the south
west silo to the south hot cell.
  
  1930   Thursday, May 23, 2019, 11:22 Travis CaveSouth Hot-CellMaintenance  Removing garbage from the south hot cell. A 55 Gal. drum was remotely lowered
into the south hot cell. It was then filled
with compressable waste. Then the drum was
  
  1929   Thursday, May 23, 2019, 08:39 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule move TM#1 has been moved from the south
hot cell to the northwest silo.
  