1938
|
Monday, June 10, 2019, 16:22 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping V on TM4, no HV cover in TH | Ramped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV |
|
1937
|
Monday, June 10, 2019, 14:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Old TM#4 source tray moved | The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high |
|
1936
|
Monday, June 10, 2019, 08:26 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping voltage on TM4 w/o source tray | TM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC |
|
1935
|
Friday, June 07, 2019, 13:11 |
David Wang | Conditioning Station | Development | TM4 | | TCS and TM4. | TM4 has been connected at TCS for HV test.
TCS water system and vacuum pumps are switched
on. |
|
1934
|
Friday, June 07, 2019, 08:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
hot cell to the conditioning station. |
|
1933
|
Thursday, June 06, 2019, 10:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target, no source Tray | Electrical Check | Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered |
|
1932
|
Tuesday, June 04, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM2 | | ITE water signal interlock check. | ITE water signal interlock check is done.
Everything is good. Coil 2 circuit
no longer used in ITE . PQRU are looped as |
|
1931
|
Friday, May 24, 2019, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
west silo to the south hot cell. |
|
1930
|
Thursday, May 23, 2019, 11:22 |
Travis Cave | South Hot-Cell | Maintenance | | | Removing garbage from the south hot cell. | A 55 Gal. drum was remotely lowered
into the south hot cell. It was then filled
with compressable waste. Then the drum was |
|
1929
|
Thursday, May 23, 2019, 08:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the south
hot cell to the northwest silo. |
|
1928
|
Wednesday, May 22, 2019, 11:52 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 inpsection. | TM1 shielding plates and their holding
bolts are inspected. No corrosion.
TM1 is located at TCS now. Both TP1 and TP2 |
|
1927
|
Wednesday, May 22, 2019, 11:50 |
David Wang | ITE | Standard Operation | TM4 | | TM2 has been connected in ITE. | TM2 has been connected in ITE. high active
water system and vacuum pumps are started.
The pumping down on TM2 and ITE is good |
|
1926
|
Wednesday, May 22, 2019, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the north
west silo to the conditioning station for
the day it will be moved back to the silo |
|
1925
|
Friday, May 17, 2019, 16:46 |
Adam Newsome | Safe Module Parking | Development | | | SMP Controls Installation Update |
The following controls-related |
|
1924
|
Friday, May 17, 2019, 10:47 |
Travis Cave | ITE | Standard Operation | TM2 | Ta#58 | Module move | TM#2 with Ta#58 has been moved from
the south hot cell to the east target station. |
|
1923
|
Thursday, May 16, 2019, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Electrical Check | Results of the electrical check of
TM#2 without target and with the new Ta#58
target. |
|
1922
|
Thursday, May 16, 2019, 12:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Ta #58 installed | Ta #58 has been installed onto TM2. All
new silver plated high current fasteners.
All torqued to 130 in lbs. |
|
1921
|
Wednesday, May 15, 2019, 16:06 |
Isaac Earle | Safe Module Parking | Development | | | SMP module support flange installed and leak checked | The SMP module support flange sub-assembly
(IRH1755) was installed today according to
drawing IRH1683. Dow Corning 111 sealing |
|
1920
|
Monday, May 13, 2019, 11:22 |
David Wang | ITW | Repair | | | ITW entrance module has been connnected. | Entrance module has been connected back
to ITW. Everything is normal. |
|
1919
|
Monday, May 13, 2019, 09:55 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The West Entrance module has been
moved from the south hot cell to the west
target station. |
|