1878
|
Friday, March 01, 2019, 08:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | Conditioning TM2 without source tray | BIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV |
|
|
1877
|
Tuesday, February 26, 2019, 10:33 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station. |
|
|
1876
|
Tuesday, February 26, 2019, 08:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box | The containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station. |
|
|
1875
|
Monday, February 25, 2019, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water block jig | module side water block jig has been removed
in preparation for electrical checks. |
|
|
1874
|
Friday, February 22, 2019, 10:31 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source tray removal | The source tray has been removed from TM2. |
6x |
|
1873
|
Thursday, February 21, 2019, 15:10 |
Isaac Earle | Safe Module Parking | Development | | | Seismic requirements for SMP | Dragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. |
|
|
1872
|
Wednesday, February 20, 2019, 09:07 |
chad fisher | South Hot-Cell | Repair | TM2 | | Module side waterblock jig | I have installed the module side water
block jig. |
|
|
1871
|
Tuesday, February 19, 2019, 11:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Optics tray removal | Aaron has removed the optics tray in TM2
in preparation for source tray removal. |
|
|
1870
|
Tuesday, February 19, 2019, 10:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Containment box removed | Containment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics |
|
|
1869
|
Friday, February 15, 2019, 12:09 |
David Wang | ITE | Maintenance | TM4 | | ITE water system maintenance. | The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes |
|
|
1868
|
Friday, February 15, 2019, 12:05 |
David Wang | ITE | Maintenance | TM4 | | ITE annual vacuum leak check. | Helium pressure test on all water lines:
70psi , 3 minutes. HS has a quick response
to 9Xe-9atm.cc/sec for 20 seconds. No response |
|
|
1867
|
Thursday, February 14, 2019, 14:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
|
1866
|
Thursday, February 14, 2019, 07:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS vacuum pumps have been stopped. | Preparation on TM2 move from TCS to SHC. |
|
|
1865
|
Monday, February 11, 2019, 10:26 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel moved to Target Hall | On February 8th the SMP shield
box (IRH1675) and the vacuum vessel (IRH1806)
were both raised from a horizontal to vertical |
6x |
|
1864
|
Thursday, January 31, 2019, 14:16 |
Isaac Earle | North Hot-Cell | Development | | | NHC grounding approval | Franco Mammarella was consulted regarding
electrical grounding of the NHC design (RS103
of Document-131915). After discussing |
|
|
1863
|
Monday, January 28, 2019, 10:41 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS | leak detector base LR: 0.0Xe-9atm.cc/sec.
helium 70 psi. test time : 3 minutes for
each circuit.The results in atm.cc/sec are |
|
|
1862
|
Thursday, January 24, 2019, 10:34 |
David Wang | ITW | Maintenance | | | Changed 24VDC plugs of TP solenoid valves in ITW | 3 damaged 24VDC plugs of TP solenoid valves
are replaced. Inspected other plugs. All
of them are in good condition now. |
|
|
1861
|
Tuesday, January 22, 2019, 09:56 |
David Wang | ITW | Maintenance | TM2 | | ITW water system maintenance. | ITW water system maintenance is done. All
working paddle wheels and coils are replaced.
ITW water system polyurethane tubes are replaced |
|
|
1860
|
Monday, January 21, 2019, 16:27 |
Isaac Earle | North Hot-Cell | Development | | | NHC in-cell camera wired to right side monitor | The NHC right side monitor has been
wired to display the signal from the in-cell
camera. This was tested using a snake |
|
|
1859
|
Friday, January 18, 2019, 10:26 |
Isaac Earle | North Hot-Cell | Development | | | NHC sealing improvements and repeat of RH test for LED lights | The following NHC development work was
completed under WP I2019-01-09-4:
Location of RH feature |
|