1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
|
1740
|
Monday, June 25, 2018, 11:31 |
chad fisher | South Hot-Cell | Standard Operation | | | Fields at Al cover | The shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel. |
|
|
1739
|
Friday, June 22, 2018, 13:59 |
chad fisher | South Hot-Cell | Repair | | | Soth Hot Cell Fields | Field measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is |
|
|
1738
|
Thursday, June 21, 2018, 17:15 |
Isaac Earle | North Hot-Cell | Development | | | Motorla CP200 radio with throat mic tested in NHC | A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells. A High Technology Communications |
|
|
1737
|
Thursday, June 14, 2018, 11:37 |
David Wang | ITE | Standard Operation | TM4 | UC#22 | TM4 UC 22# checklist. | See attachments |
|
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
|
1735
|
Monday, June 11, 2018, 11:30 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box on | Tm2 containment box has been re-installed
onto TM2. |
|
|
1734
|
Friday, June 08, 2018, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
|
1733
|
Friday, June 08, 2018, 11:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Removal Progress | The containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced. |
|
|
1732
|
Friday, June 08, 2018, 10:22 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Module move |
|
|
|
1731
|
Thursday, June 07, 2018, 11:37 |
Travis Cave | ITE | Standard Operation | TM4 | UC#22 | Module move | TM#4 ,with UC#22, was moved from
the south hot cell to the east target station.
Upon lowering the module down it made contact |
|
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check | The results of TM#4 with UC#22 electrical
check. See attached PDF. |
|
|
1729
|
Monday, June 04, 2018, 13:27 |
chad fisher | South Hot-Cell | Repair | TM4 | | Window Loop and Shield | The tray with window waterline loop and
EF Shield has been installed into TM4. |
|
|
1728
|
Thursday, May 31, 2018, 14:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Loop and beam shield | Tray with loop and beam shield has been
inserted into the hot cell to be installed
on TM4 . |
|
|
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. | I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping. |
|
|
1726
|
Wednesday, May 30, 2018, 09:51 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS. | I did a helium pressure test on TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this test is a reference check |
|
|
1725
|
Monday, May 28, 2018, 14:06 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#37 | Spent Target Move | SiC#37 has been moved from the South
Hot Cell to the Spent Target Vault. It was
placed in Pail #165 and put in spot 3B of |
|
|
1724
|
Friday, May 25, 2018, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
|
1723
|
Thursday, May 24, 2018, 15:19 |
Keith C Ng | Assembly/Bench Test | Repair | TM2 | | tm 2 source tray build | Attached alignment check notes after brazing
and fabrication.
First page lower half shows establishment |
|
|
1722
|
Thursday, May 24, 2018, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Modules moved | TM#4 has been moved from the south
hot cell to the east target station, and
TM#2 has been moved from the south silo to |
|