1288
|
Monday, July 18, 2016, 14:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS | Last Friday July-15, TM3 was leak checked
at TCS. All air to vacuum seals on service
cap are good. Helium pressure test |
|
1287
|
Monday, July 18, 2016, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved | TM#3 is now in the south hot cell. |
|
1286
|
Thursday, July 14, 2016, 13:25 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
|
|
1285
|
Thursday, July 14, 2016, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update TH schedule 130 according to mini-shut
down change.See attachment 1,2,3,4 |
|
1284
|
Wednesday, July 13, 2016, 08:47 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved | TM#3 has been moved from the north east
silo to the conditioning station. |
|
1283
|
Tuesday, July 12, 2016, 12:42 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) | Update schedule weekly.Attachment 1,2 |
|
1282
|
Tuesday, July 12, 2016, 12:40 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW | All turbo-pumps are started. Everything
is good so far. |
|
1281
|
Tuesday, July 12, 2016, 09:59 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#33 | module moved | TM#2 with SiC#33 has been moved from the
conditioning station to the west target station. |
|
1280
|
Monday, July 11, 2016, 10:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48 | Spent Target move | The spent Ta#48 was moved from the south
hot cell to the spent target vault. I was
placed in pail 139 and is in spot 6C in the |
|
1279
|
Friday, July 08, 2016, 16:56 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller | Plant Services group (Tony) will contact
a service tech on Monday.
Water system will be switched off |
|
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS | I connected TM2 to TCS and started water
system. |
|
1277
|
Wednesday, July 06, 2016, 15:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#33 | Conditioning SiC#33 | Wednesday, July 06, 2016, 15:23:
RGA on. IGs on
Friday, July 08, 2016, 17:07: |
|
1276
|
Wednesday, July 06, 2016, 14:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 turbo-pumps have been started. | The TCS and TM2 are pumping down. |
|
1275
|
Wednesday, July 06, 2016, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#33 | module moved | TM#2 with SiC#33 has been moved from the
south hot cell to the conditioning station. |
|
1274
|
Wednesday, July 06, 2016, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 and SiC#33 | Electrical Check | Electrical check done on TM#2 with Ta#48,
no target and SiC#33 the short on the coils
to 60kV is still present it is on the R-U |
|
1273
|
Wednesday, July 06, 2016, 09:16 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | Ta#48 removed SiC#33 installed | Ta#48 has been removed from TM2 and SiC#33
installed. |
|
1272
|
Wednesday, July 06, 2016, 07:06 |
David Wang | Conditioning Station | Standard Operation | | | venting TCS with argon. | I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon. |
|
1271
|
Wednesday, July 06, 2016, 07:03 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was connected in ITW. | TM2 was disconnected in ITW and moved to
SHC. |
|
1270
|
Thursday, June 30, 2016, 13:33 |
Dan McDonald | Spent Target Vault | Maintenance | | | F308's | The five spent target F308 flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in |
|
1269
|
Tuesday, June 28, 2016, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent target assay. | The spent target assay were finally started
or re-started today. Four targets were done
today. |
|