1208
|
Wednesday, April 13, 2016, 10:14 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south west
silo to the conditioning station. |
|
1207
|
Tuesday, April 12, 2016, 11:41 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE. | Tm4 has been connected in ITE. The ITE
and TM4 is under roughing now. ITE
Turbo-pumps have been started. Everything |
|
1206
|
Tuesday, April 12, 2016, 09:08 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#47 | module moved | TM#4 with Ta#47 has been moved from the
conditioning station to the east target station. |
|
1205
|
Monday, April 11, 2016, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM4 | | I stopped TCS and TM4 vacuum pumps. | The TM4 is still under vacuum at TCS. It
will be vented tomorrow morning.
I disconnected TM4 vacuum system |
|
1204
|
Monday, April 11, 2016, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#14 | Spent Target move | The spent UC#14 target has been moved into
the ISAC spent target vault. See the attached
PDF for the details. |
|
1203
|
Monday, April 11, 2016, 09:42 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure test on TM4 HS line at CS with new Lp Ta target | 70 psi helium , 2 minutes. Base leak rate
0.0x E-9 atm.cc/sec. base pressure 0.0XE-4
torr. no response on LD.The line is good. |
|
1202
|
Friday, April 08, 2016, 13:16 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | Update schedule weekly .see attachment
1,2 |
|
1201
|
Friday, April 08, 2016, 08:48 |
David Wang | ITW | Standard Operation | | | ITW water signal interlock check. | I did a ITW water signals interlock check
with ISAC opp. They are checked once a year
before first beam on. |
|
1200
|
Friday, April 08, 2016, 08:13 |
Anders Mjos | ITE/ITW Cooling | Maintenance | | | High Active Water Resistivity | The high active water resistivity took
a long time to recover after the upgrade
to the water cooling circuit. The system |
|
1199
|
Friday, April 08, 2016, 07:13 |
David Wang | ITW | Standard Operation | TM1 | UCx15 | TM1 has been connected in ITW. | After ITW HV test is done, TM1 has been
connected to ITW. Water signals are checked
in electrical room. They are good. |
|
1198
|
Friday, April 08, 2016, 07:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 vacuum has been connected in ITE. | All turbo pumps are started yesterday.
The pumping down is good over night. |
|
1197
|
Thursday, April 07, 2016, 09:24 |
Travis Cave | Conditioning Station | Maintenance | TM4 | Ta#47 | module moved | TM#4 has been moved from the south hot
cell to the conditioning station. |
|
1196
|
Wednesday, April 06, 2016, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14, No Target, Ta#47 | Electrical Check | Various electrical checks done on TM#4,
one of post beam UC#14, of no target and
with Ta#47. See PDFs for details. |
|
1195
|
Wednesday, April 06, 2016, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#47 | UCx#14 removed Ta#47 installed | UCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14. |
|
1194
|
Wednesday, April 06, 2016, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14 | module moved | TM#4 with UC#14 has been moved from the
east target station to the south hot cell. |
|
1193
|
Tuesday, April 05, 2016, 12:40 |
David Wang | ITE | Standard Operation | TM4 | | I stopped ITE turbo pumps this morning | The ITE and TM4 have been vented with Argon
. TM4 vacuum system is disconnected in ITE. |
|
1192
|
Tuesday, April 05, 2016, 12:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 vacuum system has been connected in ITW. | All turbo -pumps are started. |
|
1191
|
Tuesday, April 05, 2016, 09:33 |
Travis Cave | ITW | Standard Operation | TM1 | UC#15 | module moved | TM#1 with UC#15 have been moved from the
conditioning station to the west target station. |
|
1190
|
Tuesday, April 05, 2016, 07:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#15 | stop CS vacuum pumps. | Stop TCS vacuum pumps . Preparing argon
venting on TM1 and TCS.
7:34 AM, Disconnected TM1 at TCS, |
|
1189
|
Monday, April 04, 2016, 11:14 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Helium pressure test on TM1 HS line at CS | New UCx target is installed on the module.
70psi helium,3 minutes. NO response on LD.
LD is pumped to bottom LR and LP during test. |
|