1128
|
Monday, November 16, 2015, 13:59 |
Travis Cave | Conditioning Station | Maintenance | TM3 | no target | Module moved | TM#3 has been moved back to the NW silo. |
|
1127
|
Monday, November 16, 2015, 10:37 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 has been disconnected at TCS. | I stopped the TM3 and TCS vacuum pumps
and water system. The TM3 is disconnected
and vented. It will be moved to silo this |
|
1126
|
Monday, November 16, 2015, 10:33 |
Anders Mjos | Conditioning Station | Standard Operation | | FEBIAD Test Target | HV conditioning by ISAC operators | ISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry |
|
1125
|
Monday, November 16, 2015, 10:09 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check after HV conditioning | Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details. |
|
1124
|
Monday, November 16, 2015, 08:04 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments |
|
1123
|
Thursday, November 12, 2015, 13:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check and leak check | Target to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached. |
|
1122
|
Thursday, November 12, 2015, 10:18 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | | Air to vacuum leak on service cap |
|
|
1121
|
Tuesday, November 10, 2015, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started |
|
1120
|
Tuesday, November 10, 2015, 10:23 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | | Air to vacuum leak on service cap | Conducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the blue F/T insulator for |
|
1119
|
Monday, November 09, 2015, 16:47 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | FEBIAD Test Target | Leak check of Service Cap | Service cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at |
|
1118
|
Friday, November 06, 2015, 14:44 |
Anders Mjos | Conditioning Station | Repair | TM3 | | O-rings replaced on service cap | O-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit I2015-11-05-5 |
|
1117
|
Friday, November 06, 2015, 14:36 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the |
|
1116
|
Thursday, November 05, 2015, 09:57 |
Travis Cave | Conditioning Station | Maintenance | TM3 | no target | Module moved | TM#3 has been moved from the north west
silo to the conditioning station. |
|
1115
|
Thursday, October 29, 2015, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | | Filling F-308s | Five F-308s have been filled with the spent
targets. The F-308s have been moved to the
hall way between the north and south hot |
|
1114
|
Friday, October 23, 2015, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC #7 | Spent target moved | The spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then |
|
1113
|
Friday, October 23, 2015, 11:30 |
chad fisher | South Hot-Cell | Standard Operation | | ZrC#7 | ZrC#7 Spent Move and Febiad Coil | ZrC#7 was transfered to a spent target
disposal pail today and removed from the
hot cell. The "hot" end of the |
|
1112
|
Friday, October 23, 2015, 07:41 |
Dan McDonald | Spent Target Vault | Maintenance | | | F-308's | Six F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some |
|
1111
|
Wednesday, October 21, 2015, 11:58 |
Anders Mjos | South Hot-Cell | Development | TM2 | ZrC#7 | Extraction Electrode inspection | The failed extraction electrode was inspected
in the hot cell this morning by Anders and
Chad. The following electrical measurements |
|
1110
|
Wednesday, October 21, 2015, 09:49 |
chad fisher | South Hot-Cell | Repair | | | Manipulator handle repair | Rebuild handle of manipulator serial 7986
(currently in the east position) and replaced
broken snap ring 5555-18h on west side of |
|
1109
|
Tuesday, October 20, 2015, 13:52 |
chad fisher | South Hot-Cell | Maintenance | | | TM4 Febiad coil line disposal | The febiad coil line removed from TM4 has
been cut into pieces small enough to be disposed
of in a 5 gal pal. The line was cut with |
|