Message ID: 949     Entry time: Tuesday, June 16, 2015, 14:28
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 Source Tray Installation/Water Block Sealing Surface Clean 

Today cleaning and polishing pads were inserted into the hot cell.

Module side waterblock jig installation was attempted however one of the locking tabs/latches (ITA2405?) came undone/fell off. Luckily, I had old, obsolete jigs in the hot cell so I was able to remove parts I needed from an old one and rebuild the current one.

Jig was installed on module to retain module side waterblocks.

Blank-off remove was commenced, however due to and large amount of water coming out of the line to have the blank-off removed work had to stop till the water evaporates.

Waterblock sealing surface cleaning and polishing will continue tomorrow.

Also, upon installing the jig a piece of fiberglass that had previously been manual inserted between two of the water lines (early to mid 2000's) fell out.

Attachment 1: 20150616_104240.jpg  1.121 MB  | Hide | Hide all
20150616_104240.jpg
Attachment 2: 20150616_140505.jpg  1.035 MB  | Show | Hide all
Attachment 3: 20150616_140506.jpg  1.008 MB  | Show | Hide all