Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 630     Entry time: Tuesday, March 25, 2014, 09:11
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#42 
Subject: Ta#42 install and "new" 9 pin 

Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease.

Attachment 1: TM4_20140325_01.jpg  909 kB  | Show | Show all
ELOG V2.9.2-2455