Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 509     Entry time: Friday, October 18, 2013, 13:43
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: C2 Circuit Removal 

The C2 circuit (coil 2) water lines and blocks have been revoed from TM4.

Water block jig could not be used as the window water block connection was nowhere near fitting into the jig (IMG_1224 image below) and therefore caused an interference causing the rest of the blocks to not mate with the jig. A different tool that has never been used was implimented and sucessful (IMG_1227 below).

 Sorry about the picture numbering format...new format will be implimented next time.

Attachment 1: IMG_1224[1].JPG  2.466 MB  | Show | Hide all
Attachment 2: IMG_1227[1].JPG  2.830 MB  | Show | Hide all
Attachment 3: IMG_1230[1].JPG  2.607 MB  | Hide | Hide all
IMG_1230[1].JPG
ELOG V2.9.2-2455