Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2814     Entry time: Tuesday, June 17, 2025, 12:59
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: C#5 
Subject: electrical check/leak check 

 TM4 with new target number C#5 installed had been leak/electric checked on NHC flange in TH. see pic attached with pls.

Attachment 1: TM4_electric_and_leak_check_after_C#5_installed_2025-06-17.pdf  74 kB  | Show | Show all
ELOG V2.9.2-2455