Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2713     Entry time: Wednesday, November 06, 2024, 16:33
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCX46 
Subject: TM4 with UCx46 electrical and leak check at SHC 

TM4 with UCx46 electrical and leak check at SHC is done. Everything is good.

Attachment 1: TM4_UCx46_electrical_check.pdf  117 kB  | Hide | Hide all
TM4_UCx46_electrical_check.pdf TM4_UCx46_electrical_check.pdf
ELOG V2.9.2-2455