Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2549     Entry time: Wednesday, March 13, 2024, 11:12
Author: Keith C Ng 
Category: Assembly/Bench Test 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: optics tray for tm3 

Alignment notes attached for the optics tray for the refurbished tm3 with the new service and source tray.

 

*Note: Drive screw bracket sheared off during alignment check with source tray. The drive bracket was replaced. The optics tray was re checked. The front element was .015 to left and centered u/d. The rear element remained the same. The center element could not be checked to do the assembly.

Attachment 1: 20240313_optics_tray_alignment_notes.pdf  8.487 MB  | Show | Show all
ELOG V2.9.2-2455