Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1962     Entry time: Wednesday, August 14, 2019, 11:43
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#58 and no target. 
Subject: Results of electrical checks post beam at the south hot cell. 

 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target attached.

Attachment 1: TM2_elec_chk_Ta58_post_beam_shc.pdf  171 kB  | Hide | Hide all
TM2_elec_chk_Ta58_post_beam_shc.pdf
Attachment 2: TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf  221 kB  | Show | Hide all
ELOG V2.9.2-2455