Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron, Page 5 of 10  Not logged in ELOG logo
  ID Date Author Category Type Subjectdown Text Attachments
  181   Tuesday, June 04, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceLower Resonator Trolley  12, 24 and 60   
  89   Thursday, June 30, 2016, 13:47 Dan McDonaldTrolleyMaintenanceLift trolleyMaintenance has been performed on the lift
trolley, re sealed the main drive gear box
it was quite dry inside and in need of new
  
  168   Friday, February 16, 2024, 11:11 Adam NewsomeTrolleyRepairLift Trolley: vertical motion failure, motor relays replacedToday (2024-02-16) when operating the lift
trolley to install shields in the cyclotron,
the vertical motion was observed to be intermittently
  
  157   Thursday, September 14, 2023, 13:51 Adam NewsomeTrolleyMaintenanceLift Trolley: upgrades to camera tilt mechanismThe two camera tilt mechanisms on the lift
trolley have been upgraded. Upgrades include:
For the individual camera:
 PXL_20230914_193143524.jpg 
  158   Friday, September 15, 2023, 10:15 Adam NewsomeTrolleyMaintenanceLift Trolley: mirror actuation mechanism repair/upgradeThe mirror actuation mechanism was observed
to be "sticky" during 2023 winter
shutdown - it occasionally did not function
 PXL_20230915_164811247.jpg 
  109   Monday, February 19, 2018, 12:58 maicodallavalleTrolleyRepairLift Trolley RepairWe had just finished pulling out the ladders
from the cyclotron with the lift trolley.
We started to run the lift trolley into the
  
  104   Tuesday, January 09, 2018, 15:54 Jason KapalkaCyclotronStandard OperationLid-up sequence (in-tank work)2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered
  
  7   Tuesday, January 29, 2013, 18:49 Grant MinorElevation JackStandard OperationLid-up complete - summary notesLid-up was first attempted yesterday (Jan
28th) by Dan Louie, Arthur Leung, and Maico
Dalla Valle.  They experienced problems
 Jacks_Station_6_and_4_Procedure_Jan_12_2012_122.jpg 
  12   Wednesday, February 06, 2013, 18:07 Grant MinorElevation JackMaintenanceLid-down yoke gap measurements from 1994Attached is a scan of a handwritten record
from 1994 showing yoke-to-upper-structure
gap measurements from 1994, both L and R
 Elevation_Yoke_Measurements_1994.pdf 
  49   Tuesday, January 27, 2015, 11:39 Grant MinorElevation JackStandard OperationLid-Up Report 26 Jan 2015






Normal
0
 Station_8_Interference_Measurment_26Jan2015.JPGStation_8_Lid_Up_without_platform_26Jan2015.JPG 
  59   Friday, March 06, 2015, 16:42 Grant MinorElevation JackStandard OperationLid-Down Report 6-March-2015Lid down started around 2:30 pm today (March
6th, 2015)
Master Start: 47422
 Electrical_Cover_Knocked_Off_6March2015.JPG 
  65   Friday, March 27, 2015, 07:31 Dan McDonaldCyclotronRepairLid up operationsLid up recap for  March 26th 2015.

Start time 14:50       
  
  115   Thursday, January 30, 2020, 06:55 Dan McDonaldCyclotronStandard OperationLid up operationsLid up operations took place on January
21st starting at 10:25 lid went up without
issue. Couple things to note are station
 lid_up_2020.xlsx 
  167   Friday, February 09, 2024, 15:43 Adam NewsomeElevation JackStandard OperationLid up operation - 2024The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4.
 Elevation_System_Checklist_-_February_2024.xlsxElevation_System_Thermal_Imaging_Report_-_Lid_Up_Feb_2024.pdf 
  148   Monday, January 30, 2023, 12:20 Adam NewsomeCyclotronStandard OperationLid up operation - 2023 The lid up operation
took place on Jan. 30, 2023. 
 2023_Synchro_Counts.xlsx2023_Jacks_Infrared_Data.xlsx 
  137   Friday, February 04, 2022, 11:52 Adam NewsomeCyclotronStandard OperationLid up operation - 2022The lid up operation
took place on Feb. 4, 2022. 
  
  127   Friday, January 22, 2021, 14:30 Adam NewsomeCyclotronStandard OperationLid up operation - 2021The lid
up operation took place on Jan. 22, 2021.
The
  
  173   Thursday, May 02, 2024, 12:42 Adam NewsomeElevation JackStandard OperationLid up operation (third) - 2024The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and  finishing at ~12:12pm
under work permit C2024-05-02-5. 
 Elevation_System_Checklist_-_2024_-_May.pdf 
  171   Wednesday, April 24, 2024, 14:26 Adam NewsomeElevation JackStandard OperationLid up operation (second) - 2024Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown.
 Elevation_System_Checklist_-_2024_-_Second_Lid_Up.pdf 
  102   Tuesday, March 14, 2017, 17:57 Jason KapalkaCyclotronStandard OperationLid raising and lowering operationsLid up (Attempt #1)

Pre-indexed 
  
ELOG V2.9.2-2455