Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 10     Entry time: Wednesday, February 06, 2013, 17:42
Author: Grant Minor 
Category: Elevation Jack 
Type: Maintenance 
Subject: In-situ jack power screw lubrication inspection - Stations 9, 10, 11, and 6 

Due to concerns raised regarding the state of the lubrication of the power screws at Station 9, the lubrication was visually inspected by me and Ron Kuramoto on February 4th.

Photos are attached.

The power screws for these stations were serviced and re-lubricated on the following dates:

Station 9 - 1996

Station 10 - 2001

Station 11 - 1997

Station 6 - 2011

There did not appear to be any major visual differences in the lubrication between any of these stations.  The grease at Station 9 appeared to coat the power screw uniformly through its range of travel, and there were no major signs of drying, hardening, or separation of the constituents relative to the other stations inspected.

There is a slight apparent difference in the opacity of the grease between Station 9 and Station 6 in the photos attached, but this may be due to the lighting and camera flash at the angle taken.

There did not appear to be any flecks of metal, contaminants, or other signs of abnormal wear in the grease.

The mechanical properties of the grease at Station 9 vs. virgin grease would have to be assessed by a tribologist in a laboratory setting from samples.

Samples of the grease were not collected at this time, but could possibly be collected in the future when Station 9 is removed for service.

 

 

Attachment 1: Jack_Inspect_InSitu_Station_6L_4Feb2013_018.jpg  1.989 MB  | Hide | Hide all
Jack_Inspect_InSitu_Station_6L_4Feb2013_018.jpg
Attachment 2: Jack_Inspect_InSitu_Station_6L_4Feb2013_019.jpg  2.047 MB  | Show | Hide all
Attachment 3: Jack_Inspect_InSitu_Station_6R_4Feb2013_020.jpg  1.906 MB  | Show | Hide all
Attachment 4: Jack_Inspect_InSitu_Station_6R_4Feb2013_021.jpg  2.226 MB  | Show | Hide all
Attachment 5: Jack_Inspect_InSitu_Station_9L_4Feb2013_001.jpg  2.269 MB  | Show | Hide all
Attachment 6: Jack_Inspect_InSitu_Station_9L_4Feb2013_003.jpg  2.025 MB  | Show | Hide all
Attachment 7: Jack_Inspect_InSitu_Station_9L_4Feb2013_006.jpg  2.284 MB  | Show | Hide all
Attachment 8: Jack_Inspect_InSitu_Station_9R_4Feb2013_004.jpg  1.912 MB  | Show | Hide all
Attachment 9: Jack_Inspect_InSitu_Station_9R_4Feb2013_005.jpg  2.020 MB  | Show | Hide all
Attachment 10: Jack_Inspect_InSitu_Station_10L_4Feb2013_007.jpg  2.044 MB  | Show | Hide all
Attachment 11: Jack_Inspect_InSitu_Station_10L_4Feb2013_008.jpg  2.193 MB  | Show | Hide all
Attachment 12: Jack_Inspect_InSitu_Station_10L_4Feb2013_009.jpg  2.280 MB  | Show | Hide all
Attachment 13: Jack_Inspect_InSitu_Station_11L_4Feb2013_010.jpg  2.107 MB  | Show | Hide all
Attachment 14: Jack_Inspect_InSitu_Station_11L_4Feb2013_011.jpg  2.237 MB  | Show | Hide all
Attachment 15: Jack_Inspect_InSitu_Station_11R_4Feb2013_012.jpg  2.219 MB  | Show | Hide all
Attachment 16: Jack_Inspect_InSitu_Station_11R_4Feb2013_013.jpg  2.059 MB  | Show | Hide all
ELOG V2.9.2-2455