  112   Tuesday, March 13, 2018, 15:36 Keith C NgM9Standard Operationm9 alignment work

Set up shielding canyon for M9 laser tracker job.

dms.jpg

 

Fill shielding blocks are not removed yet, to be done tomorrow.

 

  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off

1. Blank off installed 11:40 with Dan McDonald, east spring ear looks 'deeper" than west.

- Reused all hardware from last install, most active hardware was around 10 mSv/h on contact

- Zero point was at the 1/2 turn marker pen mark

- Installed at 1.5 turns from "finger tight" zero.

 

2. Spring eye zero set on a spare flange with spare pins.

- backed off 1/2 turn then mounted to exit port.

- tightened .5 turn to get to zero, then 1.5 turns on east and west sides to seal, in increments of .5 turns alternating.

 

3. Called Edi to start pumping on T2 at 12:50

Attachment 1: 20180327_t2m9_P1030978.JPG
20180327_t2m9_P1030978.JPG
Attachment 2: 20180327_t2m9_P1030979.JPG
20180327_t2m9_P1030979.JPG
  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation survey

Surveyed contents of storage flask located at TNF. The lid was lifted off roughly 12" up and a pole monitor was swept over the opening. The fields of the combined items in the flask were 9.84 mSv/h at 12-24". Extrapolated, the field is approximately 3.7 mSv/h at 1/2 m. 

The flask contains an indium blank off plate, ISAC beam window and some miscellaneous used water fittings. The ISAC window is probably the largest contributor to the field.

A list of the contents and the dates the were placed into the flask are attached to the top of the flask lid.

  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install

 2022 Apr 28 to 29:

Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly. 

The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.

See attached pdf report for photos and more description.

Attachment 1: 2022_4v_cm1_rh_joint_install.pdf
2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf
  1   Thursday, June 30, 2011, 16:58 John WongPrimary BeamlinesRepairblah blah blah

dfdfdfdfdf

  2   Tuesday, February 14, 2012, 16:29 Keith C NgM20Repairm20 q1 q2 repair

Warm cell reconfigured for water leak repair at coil termination. Radiation surveys done. M20 Q1 ready for removal of insulators.

Attached photo of warm cell as of Tuesday morning.

Attachment 1: P1010986.JPG
P1010986.JPG
  3   Thursday, February 16, 2012, 08:08 Keith C NgM20Repairm20 q1 q2 repair

Insulators # 6,7,8 removed from Q1 headers late afternoon by C Ballard. Ready for removal and re-brazing of #7 joint some time today.

Attachment 1: P1020003.JPG
P1020003.JPG
Attachment 2: P1020001.JPG
P1020001.JPG
  4   Thursday, February 16, 2012, 16:22 Keith C NgM20Repairm20 q1 q2 repair

Old #7 coil fitting removed, replaced and re-brazed today by M Good. Insulators ready to go back on to magnet coils to be pressure checked.

Image P1020013.JPG shows #7 coil fitting before removal. Heat shielding in the form of small aluminum sheets were installed to protect the magnet and electrical wiring.

Image P1020028.JPG shows new #7 fitting with all tools removed from area.

Attachment 1: IMG_2545.JPG
IMG_2545.JPG
Attachment 2: P1020013.JPG
P1020013.JPG
Attachment 3: P1020028.JPG
P1020028.JPG
  5   Friday, February 17, 2012, 15:35 Keith C NgM20Repairm20 q1 q2 repair

Reinstalled ceramic insulators #6 7 8 to Q1 magnet by C Ballard. #6 and 8 went on with no issues. The copper tubing on insulator #7 had to be bent to match the new position of the re-brazed #7 fitting. This may have been due to the removal of the inner and outer conductors (the two copper plates that clamp the two coils together) during yesterdays repair which shifted the position of the coil. See photos.

Attachment 1: P1020033.JPG
P1020033.JPG
Attachment 2: P1020037.JPG
P1020037.JPG
Attachment 3: P1020038.JPG
P1020038.JPG
Attachment 4: P1020035.JPG
P1020035.JPG
Attachment 5: P1020031.JPG
P1020031.JPG
  6   Thursday, March 01, 2012, 16:01 Keith C NgPrimary BeamlinesRepair2C Rad Hard Valve Replacement

4" indium flanges at the 2C rad hard valve were cleaned of the remaining indium by C. Ballard. Both upstream and down stream flanges were done, ready for installation of new valve.

  7   Thursday, May 24, 2012, 18:59 Grant MinorM20RepairM20 front-end leak vacuum check T2/Q1/Q2/Scraper

Remote Handling plus support groups are currently attempting to install and commission indium vacuum seals into the following M20 front-end joints:

- T2/Q1

- Q2/Scraper

- Scraper/T2

 

The first indium joint installed was at T2/Q1 during the week of May 14 to 18.  Rubber seals were installed at the other two joints.  The system was leak checked on Tuesday May 22 and a suspect leak response was detected. 

The details of the installation and the leak check are in the attached .pdf e-mail dated 23 May 2012.

Today (Thursday 24 May 2012) the T2 volume and M20 front-end vacuum system were leaked checked with rubber seals in all aforementioned joints by RH group and Vacuum Group.  The results are listed below:

The test equipment consisted of a long Remote Handling pole with a copper helium applicator line attached to the end, joined to a long plastic line extending up the pole to the RH operator above. 

The plastic line was kinked with a zip-tie to cut off the flow.  To engage the flow for each test, the zip-tie was removed and the kink was opened. 

This would result in a burst of helium of a pressure you could feel easily on your face for approximately ~1s followed by a steady, very low flow just detectable on the cheek / tounge. 

The Varian Leak Detector was used attached by Vacuum Group to the T2 and M20 front end volume.  Edi Dalla Valle monitored the leak detector and communicated to Ron Kuramoto via headset radio.

The test started at 11:15 am, 1ACG4 20mT, 1AVA8 closed.

 

1) M20 Beam Blocker Top Flange (Top of T2 Monument)

11:15 am

Base leak rate 1.5 x 10-8 atmcc/sec

10 second spray of helium

No response after 2 min.

 

2) M8 T2 Blank-Off Flange

11:30 am

Base leak rate 1.5 x 10-8 atmcc/sec

5 second spray

First reponse after 30 seconds

Peak at 2 minutes, 4.1x10-8 atmcc/sec

 

3) M20 Q1/T2 Flange Top-Dead-Center

Base rate 1.7x10-8 atmcc/sec

5 second spray

First response after 40 seconds

After 60 seconds, 2.5x10-8 atmcc/sec

Peak at 2 minutes, 3.3x10-8 atmcc/sec

Recovery beginning after 2.5 minutes

 

4) M20 Q1/T2 Flange Bottom-Dead-Center

Base rate 1.7x10-8 atmcc/sec

5 second spray

First response at 45 seconds

Peak at 3 minutes 3.0x10-8 atmcc/sec

 

*1ACG4 read 16 mTorr at 11:55 am

 

5) M9 Q1/T2 Flange Top-Dead-Center

Base rate 1.6x10-8 atmcc/sec

5 second spray

No response after 3 minutes

 

6) Downstream T2 / 1AQ14 (Collimator B Area, see attached photo of Ron Kuramoto applying helium at this area)

Base rate 1.5x10-8 atmcc/sec

5 second spray

First response after 10 seconds

3.3x10-8 atmcc/sec at 1 minute

Peak at 1m 45 sec 3.6x10-8 atmcc/sec

 

7) M20 Q2/Scraper

Base rate 1.6x10-8 atmcc/sec

5 second spray

First response after 2 minutes 1.7x10-8 atmcc/sec

Peak at 2.5 minutes 1.8x10-8 atmcc/sec

 

This leak check confirmed suspicions of helium drift to the known leak at T2 / 1AQ14 joint on the T2 monument. 

The delayed leak response seen on May 22nd at M20 T2/Q1 is very likely drift of helium to this known leak based on these measurements, and not an actual leak at T2/Q1.

Edi Dalla Valle re-confirmed these leak check results with standard remote helium line tests.  His notes for these tests are scanned and attached.

 

We will proceed tomorrow to make up the T2/Q1 joint with the same ring and pin combination as used May 17 to May 22 2012.

 

 

Attachment 1: M20_Front_End_Leak_Check_May_24_2012_RemHand_Notes.pdf
M20_Front_End_Leak_Check_May_24_2012_RemHand_Notes.pdf
Attachment 2: M20_Front_End_Leak_Check_May_24_2012_EDV_Notes.pdf
M20_Front_End_Leak_Check_May_24_2012_EDV_Notes.pdf
Attachment 3: 2012_05_24_RH1-002.JPG
2012_05_24_RH1-002.JPG
Attachment 4: 2012_05_24_RH1-003.JPG
2012_05_24_RH1-003.JPG
Attachment 5: 2012_05_24_RH1-005.JPG
2012_05_24_RH1-005.JPG
Attachment 6: M20-T2_Area_Front_End_Status_-_Remote_Handling_-_23_May_2012.pdf
M20-T2_Area_Front_End_Status_-_Remote_Handling_-_23_May_2012.pdf
  8   Thursday, October 11, 2012, 16:40 Keith C NgM9Repairm9 t2 joint repair

Today:

Bridge setup complete; Noticed 12 x 3 x 3 block when placed on top of several other blocks rocked when placed down.

Took initial photos of joint: west side approximately 0.05" to 0.06" gap, east side 0.20" to 0.220" gap. Joint appears to be the same as before. See photos.

 

Will do visual/video inspection and leak check tomorrow morning.

Attachment 1: 20121011_RH1_01_0357.JPG
20121011_RH1_01_0357.JPG
Attachment 2: 20121011_RH1_02_0367.JPG
20121011_RH1_02_0367.JPG
Attachment 3: 20121011_RH1_02_0362.JPG
20121011_RH1_02_0362.JPG
Attachment 4: 20121011_RH1_02_0363.JPG
20121011_RH1_02_0363.JPG
  9   Friday, October 12, 2012, 15:12 Keith C NgM9RepairM9 T2 Joint Repair cont.

Joint repair continues.

 

Leak Check:

- Local leak check performed around area of T2, M9-Q1. All seals other than T2 Q1 were leak tight. Largest source of leak was the T2 Q1 joint area.

- Leak check done in quadrants around joint, response times were <2 sec of applying helium. Leak detector also responded when He probe was near joint (before actually applying He).

 

Video and Physical inspection:

- Bottom weld lug bolt found in tension/captive (ie. not free to move). Confirmed static by poking bolt. (Videos of this in RH group folder).

- Top weld lug had > 0.2" of gap.

- East and West pins seen leaning slightly toward North (toward Q1).

 

Loading Test:

At 13:30 a load test was performed to observe the effects of loading nearby blocks around T2 (see photo). Two 12 x 6 x 3 shield blocks were stacked one on top of the other and vacuum was observed, one then the other. There was no observable effect on the vacuum each time. Bottom weld lug bolt was still frozen when poked.

Blocks were replaced to their original locations once test was complete.

 

The T2 volume was vented at ~14:15 in preparation for disassembly to be performed on Monday.

 

Attachment 1: 20121012_RH2_01_0002.JPG
20121012_RH2_01_0002.JPG
Attachment 2: 20121012_RH2_01_0004.JPG
20121012_RH2_01_0004.JPG
  10   Monday, October 15, 2012, 17:03 Keith C NgM9RepairM9 T2 joint repair cont.

Today:

- Removed pins and removed indium through ring. Joint fully open at 14.5 to 15 turns of retraction mechanism.

- Did initial video inspection of T2 and Q1 flanges, some residual indium on knife surfaces, did initial scraping of T2 flange. (see videos on RH group folder)

- One blank off prepared with indium ready for installation.

 

Will continue tomorrow with Q1 scrape and re inspection.

  11   Tuesday, October 16, 2012, 19:47 Grant MinorM9RepairInspection of failed double-indium thru-ring TB22148

See inspection notes attached for failed M9T2 double-indium thru-ring TB22148, inspected on Oct 15th 2012.

Ring was approximately 3 mSv/hr on contact and 100 uSv/hr at 0.5 m.

Total dose accumulated during inspection on dosimeter 122 was 0.1 mSv

 

Attachment 1: TB22148_thru_ring_inspT2_15oct2012.pdf
TB22148_thru_ring_inspT2_15oct2012.pdf
Attachment 2: TB22148_thru_ring_inspQ1_15oct2012.pdf
TB22148_thru_ring_inspQ1_15oct2012.pdf
  12   Tuesday, October 16, 2012, 19:50 Grant MinorM9RepairM9T2 Joint Repair - Status Update 16 Oct 2012

See attached.

Attachment 1: M9T2_Joint_Repair_-_Status_Update_16_Oct_2012.pdf
M9T2_Joint_Repair_-_Status_Update_16_Oct_2012.pdf
  13   Thursday, October 18, 2012, 08:26 Keith C NgM9RepairM9 T2 joint repair cont.

Yesterday:

Installed indium blank off at M9 T2 joint and pumped down at 15:20 to 15:45 overnight. 1ACG7 (T2 vacuum pressure) reads between 6.0E-3mT and 2.0E-2 mT as of 8:15 today.

- Before installing, an attempt was made to set the bellows in a position to correct for some of the misalignment. This was done by closing the joint with no ring and pinning the east flange ear and leaving it for ~1 hour.

- Blank off installation began at 12:30

- A universal joint installation tool was used to install the East pin. This was due to the very small gap available to install the pin on the East side. The east side of the flange was also pried upon in order to close the east side of the joint. As a result the pin leans North once installed. West pin was installed with no issues.

- Installation finished at 14:30 (roughly two hours, not including flange prep work)

- An inspection after installation revealed the lower lug to be in tension an hour after installation of the pins and blank off.

- Spring eye gaps on installation appeared to be 0.05" to 0.06" on the west side and ~0.2" on the east side.

 

Will be doing inspection and leak check later today.

  14   Thursday, October 18, 2012, 16:28 Keith C NgM9RepairM9 T2 joint repair cont.

Today:

Completed leak check of M9 T2 area: joint(s) are He leak tight. Remote He lines checked as well, see attached.

 

- Indium blank off ring was cut free from the string tethers.

- Removed extra tooling and equipment, West side pin threaded cap installed. East side needs new capping device since the lean of the pin is beyond installation parameters.

- Vacuum pressure still running higher than normal but stable (see previous e log).

- Water leak in the M9 Q2 magnet return header was discovered. Very slow leak (> 10 minutes per drop). See attached photo and videos on RH group drive.

 

Cleanup continues tomorrow.

Attachment 1: T2_Remote_Leak_Check.PDF
T2_Remote_Leak_Check.PDF
Attachment 2: 20121018_m9q2_waterleak.jpg
20121018_m9q2_waterleak.jpg
  15   Friday, October 19, 2012, 16:48 Keith C NgM9RepairM9 T2 Joint Repair cont.

Today:

Cleaned up work site and removed extraneous poles and tooling. Radioactive parts stored in lead flask now located on TNF.

- Two pins, an RH bullet bolt and indium ring (tb22148) were put into lead flask for storage, flask now located on TNF.

- Took photos of spring eye gaps and some video inspection, looks roughly the same as yesterday (see photos).

- Installed a dust cover over the east spring pin (see photos).

 

Looking at placement of indium rings loaded with EPDM and Buna N at joint for radiation exposure. Will install the test rig on Monday & clean up site for covering up.

Attachment 1: 20121019_RH1_01_0081.JPG
20121019_RH1_01_0081.JPG
Attachment 2: 20121019_RH1_01_0082.JPG
20121019_RH1_01_0082.JPG
Attachment 3: 20121019_RH2_02_0004.JPG
20121019_RH2_02_0004.JPG
  17   Monday, October 22, 2012, 15:48 Keith C NgM9RepairM9 T2 clean up and shield restoration

Today;

Restoring shielding at M9 T2 area and cleaning up RH setup.

 

- RH workbench, pole tray and bridges removed from work site.

- 18' x 6' by 3' bridging block removed (at 14:25) to reveal the T2 monument. No apparent change in vacuum, will monitor as shielding is restored.

- Magnet power tests completed by beamlines group, no issues reported.

- Rubber testing ring installed between M9 Q1 and T2, see photo.

- Spring eye gaps appear to be the same as on Friday (after 48h), see photos and video.

 

Work continues re covering the M9 T2 site tomorrow.

Attachment 1: 20121022_RH1_02_0092.JPG
20121022_RH1_02_0092.JPG
Attachment 2: 20121022_RH1_02_0081.JPG
20121022_RH1_02_0081.JPG
Attachment 3: 20121022_RH1_02_0082.JPG
20121022_RH1_02_0082.JPG
ELOG V2.9.2-2455