119
|
Tuesday, April 16, 2019, 11:19 |
Ron Kuramoto | Primary Beamlines | Repair | 1AQ14 B/L Flange Broken Thermocouple | On March 7,2019 the Thermocouple (TC) cable
which monitors the temperature of the 1AQ14
B/L vacuum joint was broken when the iron |
|
120
|
Thursday, April 25, 2019, 11:13 |
Keith C Ng | M20 | Repair | M20 Q2 repair notes | See attached scan for repair notes regarding
M20 Q2 during the 2019 winter shutdown. The
repair method for M20 Q2 was instigated by |
|
124
|
Monday, February 24, 2020, 15:13 |
Keith C Ng | M9 | Repair | m9 q1q2 repair laser tracker shoot | Beamlines
shot the position of the M9 T2 port and B1
flange for setting the M9 test stand flanges |
|
125
|
Friday, March 06, 2020, 13:36 |
Keith C Ng | M9 | Repair | M9 B1 moved to warm cell | The M9 B1 was removed from the M9
channel surveyed and moved to the remote
handling warm cell for refurbishment. |
|
129
|
Friday, March 18, 2022, 12:12 |
Keith C Ng | Primary Beamlines | Repair | q15 repair | beamlines replaced leaking insulator
on q15, circuit #4. See updated pdf for replacement
part and location. |
|
112
|
Tuesday, March 13, 2018, 15:36 |
Keith C Ng | M9 | Standard Operation | m9 alignment work | Set up shielding canyon for M9 laser tracker
job.
|
|
117
|
Tuesday, March 27, 2018, 15:08 |
Keith C Ng | M9 | Standard Operation | t2 m9 port blank off | 1.
Blank off installed 11:40 with Dan McDonald,
east spring ear looks 'deeper" than |
|
122
|
Tuesday, September 24, 2019, 14:37 |
Keith C Ng | Primary Beamlines | Standard Operation | lead pig radiation survey | Surveyed contents of storage flask located
at TNF. The lid was lifted off roughly 12"
up and a pole monitor was swept over the |
|
130
|
Friday, May 06, 2022, 11:27 |
Keith C Ng | Primary Beamlines | Standard Operation | 4V CM1 RH joint install | 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section. |
|