ID Date Author Category Typeup Subject
  119   Tuesday, April 16, 2019, 11:19 Ron KuramotoPrimary BeamlinesRepair1AQ14 B/L Flange Broken Thermocouple
On March 7,2019 the Thermocouple (TC) cable which monitors the temperature of the 1AQ14 B/L vacuum joint was broken when the iron shield block (Triumf Dwg D-3237 aka M8 Tongue block) was restored on the east of the T2 Monolyth. See attached photos. This TC (Omega #KTSS-116U-144) is attached to the 1AQ14 Indium ring seal (Triumf Ref Dwg TBP0372D) and should be replaced the next time this B/L joint is serviced. The Controls Group has noted on the CCSC2, XTPAGE 17, that TW# B1-375 is broken.
Attachment 1: 1AQ14_FlgTC1_7Mar2019.jpeg
1AQ14_FlgTC1_7Mar2019.jpeg
Attachment 2: 1AQ14_FlgTC2__7Mar2019.jpeg
1AQ14_FlgTC2__7Mar2019.jpeg
Attachment 3: 1AQ14_FlgTC3_7Mar2019.jpeg
1AQ14_FlgTC3_7Mar2019.jpeg
  120   Thursday, April 25, 2019, 11:13 Keith C NgM20RepairM20 Q2 repair notes

See attached scan for repair notes regarding M20 Q2 during the 2019 winter shutdown. The repair method for M20 Q2 was instigated by Doug Preddy and Beamlines group. Cooling line was blanked off during the 2019 winter shutdown in order to keep the M20 beamline running without removing the magnet and doing a complete repair on the leaking coil. 

Attachment 1: 2019_shutdown_m20_q2_repair_notes.pdf
2019_shutdown_m20_q2_repair_notes.pdf 2019_shutdown_m20_q2_repair_notes.pdf 2019_shutdown_m20_q2_repair_notes.pdf
  124   Monday, February 24, 2020, 15:13 Keith C NgM9Repairm9 q1q2 repair laser tracker shoot

Beamlines shot the position of the M9 T2 port and B1 flange for setting the M9 test stand flanges today. We removed the target jigs after this was done.

Attachment 1: 20200224_m9project_P1040686.JPG
20200224_m9project_P1040686.JPG
Attachment 2: 20200224_m9project_P1040688.JPG
20200224_m9project_P1040688.JPG
  125   Friday, March 06, 2020, 13:36 Keith C NgM9RepairM9 B1 moved to warm cell

 The M9 B1 was removed from the M9 channel surveyed and moved to the remote handling warm cell for refurbishment.

The warm cell is currently locked. Remote Handling should be contacted if access is needed to B1.

A field map of B1 is attached as a pdf file.

Attachment 1: 2020_M9_B1_field_survey_out_of_channel.pdf
2020_M9_B1_field_survey_out_of_channel.pdf
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair

 beamlines replaced leaking insulator on q15, circuit #4. See updated pdf for replacement part and location.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
Attachment 2: InkedRH1_0044_LI.jpg
InkedRH1_0044_LI.jpg
Attachment 3: RH1_0046.jpg
RH1_0046.jpg
Attachment 4: RH1_0050.jpg
RH1_0050.jpg
Attachment 5: RH1_0049.jpg
RH1_0049.jpg
  112   Tuesday, March 13, 2018, 15:36 Keith C NgM9Standard Operationm9 alignment work

Set up shielding canyon for M9 laser tracker job.

dms.jpg

 

Fill shielding blocks are not removed yet, to be done tomorrow.

 

  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off

1. Blank off installed 11:40 with Dan McDonald, east spring ear looks 'deeper" than west.

- Reused all hardware from last install, most active hardware was around 10 mSv/h on contact

- Zero point was at the 1/2 turn marker pen mark

- Installed at 1.5 turns from "finger tight" zero.

 

2. Spring eye zero set on a spare flange with spare pins.

- backed off 1/2 turn then mounted to exit port.

- tightened .5 turn to get to zero, then 1.5 turns on east and west sides to seal, in increments of .5 turns alternating.

 

3. Called Edi to start pumping on T2 at 12:50

Attachment 1: 20180327_t2m9_P1030978.JPG
20180327_t2m9_P1030978.JPG
Attachment 2: 20180327_t2m9_P1030979.JPG
20180327_t2m9_P1030979.JPG
  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation survey

Surveyed contents of storage flask located at TNF. The lid was lifted off roughly 12" up and a pole monitor was swept over the opening. The fields of the combined items in the flask were 9.84 mSv/h at 12-24". Extrapolated, the field is approximately 3.7 mSv/h at 1/2 m. 

The flask contains an indium blank off plate, ISAC beam window and some miscellaneous used water fittings. The ISAC window is probably the largest contributor to the field.

A list of the contents and the dates the were placed into the flask are attached to the top of the flask lid.

  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install

 2022 Apr 28 to 29:

Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly. 

The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.

See attached pdf report for photos and more description.

Attachment 1: 2022_4v_cm1_rh_joint_install.pdf
2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf