  103   Monday, February 20, 2017, 15:58 Keith C NgM9Developmentt2 m9 job wrap up

Restored shielding to T2 M9 void, blocks seem more crooked compared to previous years.

Attachment 1: 20170220_t2m9alignment_P1030616.JPG
20170220_t2m9alignment_P1030616.JPG
Attachment 2: 20170220_t2m9alignment_P1030621.JPG
20170220_t2m9alignment_P1030621.JPG
  116   Monday, March 26, 2018, 15:57 Keith C NgM9Maintenancet2 m9 laser tracker alignment

Removed all Leica tracker targets from M9 pit, I will proceed with blanking off T2 exit port sometime this week. Alignment group has taken possession of their laser equipment and the target jigs.

  115   Wednesday, March 21, 2018, 15:22 Keith C NgM9Repairt2 m9 laser tracker jigs

Installed the remaining laser tracker jigs for beam lines. No issues. Made sure 8" target the mounting poles did not interfere with each other and pin drive was engaged with no issues.

 

Attachment 1: 20180321_t2m9_P1030966.JPG
20180321_t2m9_P1030966.JPG
Attachment 2: 20180321_t2m9_P1030967.JPG
20180321_t2m9_P1030967.JPG
Attachment 3: 20180321_t2m9_P1030968.JPG
20180321_t2m9_P1030968.JPG
  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off

1. Blank off installed 11:40 with Dan McDonald, east spring ear looks 'deeper" than west.

- Reused all hardware from last install, most active hardware was around 10 mSv/h on contact

- Zero point was at the 1/2 turn marker pen mark

- Installed at 1.5 turns from "finger tight" zero.

 

2. Spring eye zero set on a spare flange with spare pins.

- backed off 1/2 turn then mounted to exit port.

- tightened .5 turn to get to zero, then 1.5 turns on east and west sides to seal, in increments of .5 turns alternating.

 

3. Called Edi to start pumping on T2 at 12:50

Attachment 1: 20180327_t2m9_P1030978.JPG
20180327_t2m9_P1030978.JPG
Attachment 2: 20180327_t2m9_P1030979.JPG
20180327_t2m9_P1030979.JPG
  118   Thursday, March 29, 2018, 15:15 Keith C NgM9Maintenancet2 m9 port blank off

Today leak checked the M9 exit port with Edi and we found no leaks. The usual delayed helium response in the M20/Collimator B/ M8(?) area is still persistent, however Edi says the vacuum level at T2 is the same as before.

Shielding should be restored next week.

 

  114   Friday, March 16, 2018, 13:39 Keith C NgM9Maintenancet2 m9 port inspection

Video imaged T2 port post blank off removal, looks roughly the same as last year. Knife edge looks clean.

Attached composite photo of flange face, ring is a stand off to maintain focus distance to camera. Also attached partial composite image of 2017 video inspection.

Attachment 1: 2018_t2m9flangeinspection2.jpg
2018_t2m9flangeinspection2.jpg
Attachment 2: 2017_t2m9flangeinspection.jpg
2017_t2m9flangeinspection.jpg
  34   Wednesday, February 06, 2013, 16:33 Keith C NgPrimary BeamlinesMaintenancet2 monolith measurements

Beam lines took measurements of top of T2 using Leica Total Station. Required no crane activities over 1A blocks.

20130206_t2alignmeas_IMG_0139.JPG

Attachment 1: 20130206_t2alignmeas_IMG_0140.JPG
20130206_t2alignmeas_IMG_0140.JPG
  106   Thursday, July 27, 2017, 09:02 Keith C NgPrimary BeamlinesDevelopmenttest

test

  90   Friday, March 04, 2016, 16:05 Keith C NgPrimary BeamlinesDevelopmentvault beamline 4 disassembly

 

Attempted to remove RH parts between Q1, 2 and monitor vacuum box. Removed Q1 to monitor box parts, could not remove monitor to Q2 parts, pin drive and indium ring are stuck in place. Indium joint is severed however. Collar was removed.

 

East leg of pin drive was bent trying to remove the stuck indium ring, it is stuck to the monitor box.

 

Recommend to proceed with removal of magnet regarless of the current state of the indium ring.

 

Pails with RH parts marked 1384, 1385, 1386 and stored in north end of vault tunnel on grey shelf. RPG storage book updated to reflect this.