  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation survey

Surveyed contents of storage flask located at TNF. The lid was lifted off roughly 12" up and a pole monitor was swept over the opening. The fields of the combined items in the flask were 9.84 mSv/h at 12-24". Extrapolated, the field is approximately 3.7 mSv/h at 1/2 m. 

The flask contains an indium blank off plate, ISAC beam window and some miscellaneous used water fittings. The ISAC window is probably the largest contributor to the field.

A list of the contents and the dates the were placed into the flask are attached to the top of the flask lid.

  123   Thursday, October 24, 2019, 14:41 Keith C NgPrimary BeamlinesMaintenanceannotated drawing of 1A Q15 cooling headers

Annotated drawing of TBP0425D attempting to capture the repairs of 1A Q15 triplet magnet ceramic insulator/coils over the years.

Note that the file contains embedded comments visible only if opening the file in adobe acrobat reader.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf
tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf
  124   Monday, February 24, 2020, 15:13 Keith C NgM9Repairm9 q1q2 repair laser tracker shoot

Beamlines shot the position of the M9 T2 port and B1 flange for setting the M9 test stand flanges today. We removed the target jigs after this was done.

Attachment 1: 20200224_m9project_P1040686.JPG
20200224_m9project_P1040686.JPG
Attachment 2: 20200224_m9project_P1040688.JPG
20200224_m9project_P1040688.JPG
  125   Friday, March 06, 2020, 13:36 Keith C NgM9RepairM9 B1 moved to warm cell

 The M9 B1 was removed from the M9 channel surveyed and moved to the remote handling warm cell for refurbishment.

The warm cell is currently locked. Remote Handling should be contacted if access is needed to B1.

A field map of B1 is attached as a pdf file.

Attachment 1: 2020_M9_B1_field_survey_out_of_channel.pdf
2020_M9_B1_field_survey_out_of_channel.pdf
  126   Thursday, March 19, 2020, 15:42 Keith C NgPrimary BeamlinesDevelopmentVault beamline beam position monitor

The Beam Position Monitor between 1VB1 and 1VM3 has been installed. The indium joints are leak tight, however the V flanges are leaking slightly. The leak is small enough to still be able to run beam.

The Pin drive at the BPM and 1VB1 joint was replaced with a new one. The pin drive that was originally there had a bent screw drive so it was retired. The clamping collars at both joints were reused.

  127   Friday, August 07, 2020, 16:18 Keith C NgM9MaintenanceT2 M9 exit port and B1 flange cleaning

Today we attempted to scrape remnant indium from T2 M9 exit port and clean B1 knife flange for the new magnet. Report of todays activities attached to the elog.

Attachment 1: Cleaning_the_flanges.pdf
Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf
  128   Monday, August 10, 2020, 16:08 Keith C NgM9DevelopmentM9 Q1Q2 magnet assembly installed in pit

The M9 Q1Q2 magnet assembly was installed in the M9 beam line today. 

Attached to elog is an inspection report of the indium ring that will be used in the M9 T2 Q1 joint.

Attachment 1: RHB_9237.JPG
RHB_9237.JPG
Attachment 2: 20200810_indiumringinspectionreport.pdf
20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair

 beamlines replaced leaking insulator on q15, circuit #4. See updated pdf for replacement part and location.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
Attachment 2: InkedRH1_0044_LI.jpg
InkedRH1_0044_LI.jpg
Attachment 3: RH1_0046.jpg
RH1_0046.jpg
Attachment 4: RH1_0050.jpg
RH1_0050.jpg
Attachment 5: RH1_0049.jpg
RH1_0049.jpg
  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install

 2022 Apr 28 to 29:

Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly. 

The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.

See attached pdf report for photos and more description.

Attachment 1: 2022_4v_cm1_rh_joint_install.pdf
2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf