109
|
Thursday, February 01, 2018, 15:44 |
Keith C Ng | Primary Beamlines | Repair | q15 repair |
Correction that all supply side (even numbered insulators) ceramic insulators on Q15 have been replaced with new old stock insulators as of today. Beamlines finds no power or water issues. Expected to cover up tomorrow moving on to the Q12 and Q13 magnet area next week.
T2 vacuum started today.
One of the cracked insulators is being stored temporarily in the warm cell (it is contaminated), Scott M. will be analyzing the broken ceramic once he has decontaminated it. |
110
|
Monday, February 05, 2018, 15:40 |
Keith C Ng | Primary Beamlines | Repair | 1A Q15 repair. |
1.) Completed covering up 1A Q15.
2.) RH flask currently contains the 8 insulators removed from Q15. 3.6 mSv/h on contact, 40-60 uSv/h @ .5 m. Double bagged. Bag exterior was swiped clean, inside was not checked (didn’t want to breach interior bag just to swipe components). |
Attachment 1: 20180205_1aq15repair_P1030889.JPG
|
|
111
|
Wednesday, February 14, 2018, 10:36 |
Keith C Ng | Primary Beamlines | Repair | 1a q12 q13 |
Uncovered and placed bridges for 1a q12 q13 for doug's re cabling work. See WP C2018-02-13-2: work permit |
Attachment 1: P1030907.JPG
|
|
119
|
Tuesday, April 16, 2019, 11:19 |
Ron Kuramoto | Primary Beamlines | Repair | 1AQ14 B/L Flange Broken Thermocouple |
On March 7,2019 the Thermocouple (TC) cable which monitors the temperature of the 1AQ14 B/L vacuum joint was broken when the iron shield block (Triumf Dwg D-3237 aka M8 Tongue block) was restored on the east of the T2 Monolyth. See attached photos. This TC (Omega #KTSS-116U-144) is attached to the 1AQ14 Indium ring seal (Triumf Ref Dwg TBP0372D) and should be replaced the next time this B/L joint is serviced.
The Controls Group has noted on the CCSC2, XTPAGE 17, that TW# B1-375 is broken. |
Attachment 1: 1AQ14_FlgTC1_7Mar2019.jpeg
|
|
Attachment 2: 1AQ14_FlgTC2__7Mar2019.jpeg
|
|
Attachment 3: 1AQ14_FlgTC3_7Mar2019.jpeg
|
|
122
|
Tuesday, September 24, 2019, 14:37 |
Keith C Ng | Primary Beamlines | Standard Operation | lead pig radiation survey |
Surveyed contents of storage flask located at TNF. The lid was lifted off roughly 12" up and a pole monitor was swept over the opening. The fields of the combined items in the flask were 9.84 mSv/h at 12-24". Extrapolated, the field is approximately 3.7 mSv/h at 1/2 m.
The flask contains an indium blank off plate, ISAC beam window and some miscellaneous used water fittings. The ISAC window is probably the largest contributor to the field.
A list of the contents and the dates the were placed into the flask are attached to the top of the flask lid. |
123
|
Thursday, October 24, 2019, 14:41 |
Keith C Ng | Primary Beamlines | Maintenance | annotated drawing of 1A Q15 cooling headers |
Annotated drawing of TBP0425D attempting to capture the repairs of 1A Q15 triplet magnet ceramic insulator/coils over the years.
Note that the file contains embedded comments visible only if opening the file in adobe acrobat reader. |
Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf
|
|
126
|
Thursday, March 19, 2020, 15:42 |
Keith C Ng | Primary Beamlines | Development | Vault beamline beam position monitor |
The Beam Position Monitor between 1VB1 and 1VM3 has been installed. The indium joints are leak tight, however the V flanges are leaking slightly. The leak is small enough to still be able to run beam.
The Pin drive at the BPM and 1VB1 joint was replaced with a new one. The pin drive that was originally there had a bent screw drive so it was retired. The clamping collars at both joints were reused. |
129
|
Friday, March 18, 2022, 12:12 |
Keith C Ng | Primary Beamlines | Repair | q15 repair |
beamlines replaced leaking insulator on q15, circuit #4. See updated pdf for replacement part and location. |
Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
|
|
Attachment 2: InkedRH1_0044_LI.jpg
|
|
Attachment 3: RH1_0046.jpg
|
|
Attachment 4: RH1_0050.jpg
|
|
Attachment 5: RH1_0049.jpg
|
|
130
|
Friday, May 06, 2022, 11:27 |
Keith C Ng | Primary Beamlines | Standard Operation | 4V CM1 RH joint install |
2022 Apr 28 to 29:
Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly.
The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.
See attached pdf report for photos and more description. |
Attachment 1: 2022_4v_cm1_rh_joint_install.pdf
|
|