  125   Friday, March 06, 2020, 13:36 Keith C NgM9RepairM9 B1 moved to warm cell

 The M9 B1 was removed from the M9 channel surveyed and moved to the remote handling warm cell for refurbishment.

The warm cell is currently locked. Remote Handling should be contacted if access is needed to B1.

A field map of B1 is attached as a pdf file.

Attachment 1: 2020_M9_B1_field_survey_out_of_channel.pdf
2020_M9_B1_field_survey_out_of_channel.pdf
  126   Thursday, March 19, 2020, 15:42 Keith C NgPrimary BeamlinesDevelopmentVault beamline beam position monitor

The Beam Position Monitor between 1VB1 and 1VM3 has been installed. The indium joints are leak tight, however the V flanges are leaking slightly. The leak is small enough to still be able to run beam.

The Pin drive at the BPM and 1VB1 joint was replaced with a new one. The pin drive that was originally there had a bent screw drive so it was retired. The clamping collars at both joints were reused.

  127   Friday, August 07, 2020, 16:18 Keith C NgM9MaintenanceT2 M9 exit port and B1 flange cleaning

Today we attempted to scrape remnant indium from T2 M9 exit port and clean B1 knife flange for the new magnet. Report of todays activities attached to the elog.

Attachment 1: Cleaning_the_flanges.pdf
Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf
  128   Monday, August 10, 2020, 16:08 Keith C NgM9DevelopmentM9 Q1Q2 magnet assembly installed in pit

The M9 Q1Q2 magnet assembly was installed in the M9 beam line today. 

Attached to elog is an inspection report of the indium ring that will be used in the M9 T2 Q1 joint.

Attachment 1: RHB_9237.JPG
RHB_9237.JPG
Attachment 2: 20200810_indiumringinspectionreport.pdf
20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair

 beamlines replaced leaking insulator on q15, circuit #4. See updated pdf for replacement part and location.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
Attachment 2: InkedRH1_0044_LI.jpg
InkedRH1_0044_LI.jpg
Attachment 3: RH1_0046.jpg
RH1_0046.jpg
Attachment 4: RH1_0050.jpg
RH1_0050.jpg
Attachment 5: RH1_0049.jpg
RH1_0049.jpg
  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install

 2022 Apr 28 to 29:

Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly. 

The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.

See attached pdf report for photos and more description.

Attachment 1: 2022_4v_cm1_rh_joint_install.pdf
2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf
  91   Wednesday, March 16, 2016, 17:19 Ron KuramotoPrimary BeamlinesDevelopment4VQ3 Removal

 On 8March2016, under W/P C2016-03-08-2, 4VQ3 was lifted out of BL4V with the vault orbit crane where it was first weighed then lifted onto the RH flat deck rail dolly.  It was then moved into the RH basement where it was surveyed before lifting it up onto the Red wagon cart in the RH loading bay.  It was then pulled to the Meson Hall loading bay by fork lift where and then over the Cycloton vault to the top of the E-Hall roof beams under the 10 Ton crane.  4VQ3 weighed 5900 Lbs. using Plants Groups "RON Load scale".  It was 60uSv/Hr @ 0.5 M on the upstream side with no contamination on the swipes.

The total accumulated dose received was 0.34mSv spread amongst 7 people.

See the attached photos.

Attachment 1: IMG_1893.JPG
IMG_1893.JPG
Attachment 2: IMG_1893.JPG
IMG_1893.JPG
Attachment 3: IMG_1899.JPG
IMG_1899.JPG
Attachment 4: IMG_1902.JPG
IMG_1902.JPG
Attachment 5: IMG_1907.JPG
IMG_1907.JPG
  92   Wednesday, March 16, 2016, 17:57 Ron KuramotoPrimary BeamlinesDevelopment4VQ1&Q2 Removal

 On 14March2016, 4VQ1&Q2 were removed from BL4V and lowered into the Vault basement B3 level where they were stored in the south west corner on their respective wood pallets.  The hot ends of both magnets were place against the west wall.  4VQ2 was lifted out first and moved temporarily downstream where it was separated from its magnet stand. Q2 was then craned into the basement where it was tipped 45o to lay on the flat side of the magnet face.  Q2’s magnet  stand and it’s mounting brackets were then craned down onto another pallet and moved to the same storage area.

4VQ1 was pulled about 3-4 ft. downstream using a pair of ¾ Ton come-along winches to clear the overhead Elevating Jacks platform.   Q1 was then separated from its stand where both were lowered onto pallets like Q2 and moved to the storage area.  Four concrete shield blocks were postioned down stream of 4VCM1 to shield the beam exit port.

The total accumulated dose received was 0.46mSv spread amongst 5 people.  See W/P C2016-03-11-5 for Rad survey levels of Q1 & Q2.

See the attached photos.

Attachment 1: IMG_1928.JPG
IMG_1928.JPG
Attachment 2: IMG_1934.JPG
IMG_1934.JPG
Attachment 3: IMG_1935.JPG
IMG_1935.JPG
Attachment 4: IMG_1937.JPG
IMG_1937.JPG
Attachment 5: IMG_1943.JPG
IMG_1943.JPG
Attachment 6: IMG_1945.JPG
IMG_1945.JPG
Attachment 7: IMG_1946.JPG
IMG_1946.JPG
Attachment 8: IMG_1948.JPG
IMG_1948.JPG
Attachment 9: IMG_1951.JPG
IMG_1951.JPG
Attachment 10: IMG_1954.JPG
IMG_1954.JPG
Attachment 11: IMG_1957.JPG
IMG_1957.JPG
Attachment 12: IMG_1961a.jpg
IMG_1961a.jpg
Attachment 13: IMG_1968.JPG
IMG_1968.JPG
  119   Tuesday, April 16, 2019, 11:19 Ron KuramotoPrimary BeamlinesRepair1AQ14 B/L Flange Broken Thermocouple
On March 7,2019 the Thermocouple (TC) cable which monitors the temperature of the 1AQ14 B/L vacuum joint was broken when the iron shield block (Triumf Dwg D-3237 aka M8 Tongue block) was restored on the east of the T2 Monolyth. See attached photos. This TC (Omega #KTSS-116U-144) is attached to the 1AQ14 Indium ring seal (Triumf Ref Dwg TBP0372D) and should be replaced the next time this B/L joint is serviced. The Controls Group has noted on the CCSC2, XTPAGE 17, that TW# B1-375 is broken.
Attachment 1: 1AQ14_FlgTC1_7Mar2019.jpeg
1AQ14_FlgTC1_7Mar2019.jpeg
Attachment 2: 1AQ14_FlgTC2__7Mar2019.jpeg
1AQ14_FlgTC2__7Mar2019.jpeg
Attachment 3: 1AQ14_FlgTC3_7Mar2019.jpeg
1AQ14_FlgTC3_7Mar2019.jpeg
ELOG V2.9.2-2455