  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install

 2022 Apr 28 to 29:

Installed a new remote handling 4" indium joint for new beamline 4 north section. Issues were encountered in clearance between the downstream steering magnet and the compression collar of the joint. Joint installation itself went smoothly. 

The drive screw is a 17mm hex instead of a 5/8". This was noted in the install of the blank off plate in 2016.

See attached pdf report for photos and more description.

Attachment 1: 2022_4v_cm1_rh_joint_install.pdf
2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf 2022_4v_cm1_rh_joint_install.pdf
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair

 beamlines replaced leaking insulator on q15, circuit #4. See updated pdf for replacement part and location.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf
Attachment 2: InkedRH1_0044_LI.jpg
InkedRH1_0044_LI.jpg
Attachment 3: RH1_0046.jpg
RH1_0046.jpg
Attachment 4: RH1_0050.jpg
RH1_0050.jpg
Attachment 5: RH1_0049.jpg
RH1_0049.jpg
  128   Monday, August 10, 2020, 16:08 Keith C NgM9DevelopmentM9 Q1Q2 magnet assembly installed in pit

The M9 Q1Q2 magnet assembly was installed in the M9 beam line today. 

Attached to elog is an inspection report of the indium ring that will be used in the M9 T2 Q1 joint.

Attachment 1: RHB_9237.JPG
RHB_9237.JPG
Attachment 2: 20200810_indiumringinspectionreport.pdf
20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf 20200810_indiumringinspectionreport.pdf
  127   Friday, August 07, 2020, 16:18 Keith C NgM9MaintenanceT2 M9 exit port and B1 flange cleaning

Today we attempted to scrape remnant indium from T2 M9 exit port and clean B1 knife flange for the new magnet. Report of todays activities attached to the elog.

Attachment 1: Cleaning_the_flanges.pdf
Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf Cleaning_the_flanges.pdf
  126   Thursday, March 19, 2020, 15:42 Keith C NgPrimary BeamlinesDevelopmentVault beamline beam position monitor

The Beam Position Monitor between 1VB1 and 1VM3 has been installed. The indium joints are leak tight, however the V flanges are leaking slightly. The leak is small enough to still be able to run beam.

The Pin drive at the BPM and 1VB1 joint was replaced with a new one. The pin drive that was originally there had a bent screw drive so it was retired. The clamping collars at both joints were reused.

  125   Friday, March 06, 2020, 13:36 Keith C NgM9RepairM9 B1 moved to warm cell

 The M9 B1 was removed from the M9 channel surveyed and moved to the remote handling warm cell for refurbishment.

The warm cell is currently locked. Remote Handling should be contacted if access is needed to B1.

A field map of B1 is attached as a pdf file.

Attachment 1: 2020_M9_B1_field_survey_out_of_channel.pdf
2020_M9_B1_field_survey_out_of_channel.pdf
  124   Monday, February 24, 2020, 15:13 Keith C NgM9Repairm9 q1q2 repair laser tracker shoot

Beamlines shot the position of the M9 T2 port and B1 flange for setting the M9 test stand flanges today. We removed the target jigs after this was done.

Attachment 1: 20200224_m9project_P1040686.JPG
20200224_m9project_P1040686.JPG
Attachment 2: 20200224_m9project_P1040688.JPG
20200224_m9project_P1040688.JPG
  123   Thursday, October 24, 2019, 14:41 Keith C NgPrimary BeamlinesMaintenanceannotated drawing of 1A Q15 cooling headers

Annotated drawing of TBP0425D attempting to capture the repairs of 1A Q15 triplet magnet ceramic insulator/coils over the years.

Note that the file contains embedded comments visible only if opening the file in adobe acrobat reader.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf
tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf
  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation survey

Surveyed contents of storage flask located at TNF. The lid was lifted off roughly 12" up and a pole monitor was swept over the opening. The fields of the combined items in the flask were 9.84 mSv/h at 12-24". Extrapolated, the field is approximately 3.7 mSv/h at 1/2 m. 

The flask contains an indium blank off plate, ISAC beam window and some miscellaneous used water fittings. The ISAC window is probably the largest contributor to the field.

A list of the contents and the dates the were placed into the flask are attached to the top of the flask lid.

  121   Tuesday, June 11, 2019, 14:56 Keith C NgM9DevelopmentM9 B1 seal notes from 1988

 Found original installation notes for the initial installation of M9 Q1Q2 generation 2 in 1988.

Dated May 17th there is a notation that the 15 inch indium ring was loaded with "Gummy Mag". Note that the rationale for using an elastomer seal in an indium knife application is still unknown.

Attachment 1: m9_b1_seal_deans_notes_page_1.pdf
m9_b1_seal_deans_notes_page_1.pdf
Attachment 2: M9_B1_seal_Deans_Notes_Page_2.pdf
M9_B1_seal_Deans_Notes_Page_2.pdf
  120   Thursday, April 25, 2019, 11:13 Keith C NgM20RepairM20 Q2 repair notes

See attached scan for repair notes regarding M20 Q2 during the 2019 winter shutdown. The repair method for M20 Q2 was instigated by Doug Preddy and Beamlines group. Cooling line was blanked off during the 2019 winter shutdown in order to keep the M20 beamline running without removing the magnet and doing a complete repair on the leaking coil. 

Attachment 1: 2019_shutdown_m20_q2_repair_notes.pdf
2019_shutdown_m20_q2_repair_notes.pdf 2019_shutdown_m20_q2_repair_notes.pdf 2019_shutdown_m20_q2_repair_notes.pdf
  119   Tuesday, April 16, 2019, 11:19 Ron KuramotoPrimary BeamlinesRepair1AQ14 B/L Flange Broken Thermocouple
On March 7,2019 the Thermocouple (TC) cable which monitors the temperature of the 1AQ14 B/L vacuum joint was broken when the iron shield block (Triumf Dwg D-3237 aka M8 Tongue block) was restored on the east of the T2 Monolyth. See attached photos. This TC (Omega #KTSS-116U-144) is attached to the 1AQ14 Indium ring seal (Triumf Ref Dwg TBP0372D) and should be replaced the next time this B/L joint is serviced. The Controls Group has noted on the CCSC2, XTPAGE 17, that TW# B1-375 is broken.
Attachment 1: 1AQ14_FlgTC1_7Mar2019.jpeg
1AQ14_FlgTC1_7Mar2019.jpeg
Attachment 2: 1AQ14_FlgTC2__7Mar2019.jpeg
1AQ14_FlgTC2__7Mar2019.jpeg
Attachment 3: 1AQ14_FlgTC3_7Mar2019.jpeg
1AQ14_FlgTC3_7Mar2019.jpeg
  118   Thursday, March 29, 2018, 15:15 Keith C NgM9Maintenancet2 m9 port blank off

Today leak checked the M9 exit port with Edi and we found no leaks. The usual delayed helium response in the M20/Collimator B/ M8(?) area is still persistent, however Edi says the vacuum level at T2 is the same as before.

Shielding should be restored next week.

 

  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off

1. Blank off installed 11:40 with Dan McDonald, east spring ear looks 'deeper" than west.

- Reused all hardware from last install, most active hardware was around 10 mSv/h on contact

- Zero point was at the 1/2 turn marker pen mark

- Installed at 1.5 turns from "finger tight" zero.

 

2. Spring eye zero set on a spare flange with spare pins.

- backed off 1/2 turn then mounted to exit port.

- tightened .5 turn to get to zero, then 1.5 turns on east and west sides to seal, in increments of .5 turns alternating.

 

3. Called Edi to start pumping on T2 at 12:50

Attachment 1: 20180327_t2m9_P1030978.JPG
20180327_t2m9_P1030978.JPG
Attachment 2: 20180327_t2m9_P1030979.JPG
20180327_t2m9_P1030979.JPG
  116   Monday, March 26, 2018, 15:57 Keith C NgM9Maintenancet2 m9 laser tracker alignment

Removed all Leica tracker targets from M9 pit, I will proceed with blanking off T2 exit port sometime this week. Alignment group has taken possession of their laser equipment and the target jigs.

  115   Wednesday, March 21, 2018, 15:22 Keith C NgM9Repairt2 m9 laser tracker jigs

Installed the remaining laser tracker jigs for beam lines. No issues. Made sure 8" target the mounting poles did not interfere with each other and pin drive was engaged with no issues.

 

Attachment 1: 20180321_t2m9_P1030966.JPG
20180321_t2m9_P1030966.JPG
Attachment 2: 20180321_t2m9_P1030967.JPG
20180321_t2m9_P1030967.JPG
Attachment 3: 20180321_t2m9_P1030968.JPG
20180321_t2m9_P1030968.JPG
  114   Friday, March 16, 2018, 13:39 Keith C NgM9Maintenancet2 m9 port inspection

Video imaged T2 port post blank off removal, looks roughly the same as last year. Knife edge looks clean.

Attached composite photo of flange face, ring is a stand off to maintain focus distance to camera. Also attached partial composite image of 2017 video inspection.

Attachment 1: 2018_t2m9flangeinspection2.jpg
2018_t2m9flangeinspection2.jpg
Attachment 2: 2017_t2m9flangeinspection.jpg
2017_t2m9flangeinspection.jpg
  113   Thursday, March 15, 2018, 15:48 Keith C NgM9Maintenancem9 t2 alignment job

Blank off removed this morning, video recorded the T2 flange,B1 flange and B1 vacuum box interior. Blank off is 150 uSv/h @ .5m, 3 mSv/h on contact at the spring eye ears. Not swiped yet, not tagged. Currently tucked between an 18' shield block and the ME27 block.

Waiting for beam lines to install the target spheres on the target jigs, expecting to install them tomorrow.

  112   Tuesday, March 13, 2018, 15:36 Keith C NgM9Standard Operationm9 alignment work

Set up shielding canyon for M9 laser tracker job.

dms.jpg

 

Fill shielding blocks are not removed yet, to be done tomorrow.

 

  111   Wednesday, February 14, 2018, 10:36 Keith C NgPrimary BeamlinesRepair1a q12 q13

Uncovered and placed bridges for 1a q12 q13 for doug's re cabling work. See WP C2018-02-13-2: work permit