Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 120     Entry time: Thursday, April 25, 2019, 11:13
Author: Keith C Ng 
Category: M20 
Type: Repair 
Subject: M20 Q2 repair notes 

See attached scan for repair notes regarding M20 Q2 during the 2019 winter shutdown. The repair method for M20 Q2 was instigated by Doug Preddy and Beamlines group. Cooling line was blanked off during the 2019 winter shutdown in order to keep the M20 beamline running without removing the magnet and doing a complete repair on the leaking coil. 

Attachment 1: 2019_shutdown_m20_q2_repair_notes.pdf  772 kB  | Hide | Hide all
2019_shutdown_m20_q2_repair_notes.pdf 2019_shutdown_m20_q2_repair_notes.pdf 2019_shutdown_m20_q2_repair_notes.pdf
ELOG V2.9.2-2455