  65   Wednesday, April 24, 2024, 09:17 Adam NewsomeT-Hall CraneRepairTarget Hall Crane: VFD DC bus undervoltage fault [root cause: encoder board failure on 900VFD]On 2024-04-22 around 3:30 pm it was discovered
that the crane's main hoist was in a faulted
state. The operator (Adam Newsome) experienced
 DC_bus_voltage.jpegPXL_20240422_225858594.jpg 
  66   Wednesday, July 17, 2024, 15:07 Adam NewsomeHot Cell 1Standard OperationSafety Walkaround Complete - B2 LevelA safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report.
  
  67   Tuesday, September 10, 2024, 12:52 Adam NewsomeT-Hall CraneStandard OperationDrive not ready faults observed on power-upUpon powering on the crane today and attempting
to use the main hoist, the following faults
were present:
  
  68   Tuesday, September 10, 2024, 13:03 Adam NewsomeHot Cell 1DevelopmentSpacer flange installationThe spacer flanges were installed on both
turntables today. 
See photos and information in the
  
  69   Thursday, October 10, 2024, 12:22 Adam NewsomeHot Cell 1Standard OperationSafety Walkaround Complete - Hot Cell areaA safety walkaround was completed for the
ARIEL Hot Cell area. 
The resulting spreadsheet can be
  
  73   Thursday, November 28, 2024, 09:04 Adam NewsomeHot Cell 1RepairHot Cell turntables not rotating, access hatch not movingIt was reported that the hot cell turntables
would not rotate and the access hatch could
not be operated. The turntables' elevation
  
  74   Friday, November 29, 2024, 15:23 Adam NewsomeHot Cell 1Maintenance1000 kg crane: y axis position display not functioningAfter a recent power cycle, the y-axis
referencing was lost for the 1000 kg crane.
The position readout was also incorrect,
 PXL_20241202_204356508.jpg 
  87   Wednesday, April 09, 2025, 15:31 Adam NewsomeHot Cell 1DevelopmentTwo jib cranes installedTwo externally mounted jib cranes were
installed on the ARIEL hot cell - one on
the West side above the tool port, and one
 ACDC_CRANES_3500_Job_10098_General_Quote24_2.pdfPXL_20250409_175712902.MP.jpgPXL_20250409_175730905.MP.jpg 
  90   Wednesday, April 23, 2025, 15:59 Adam NewsomeHot Cell 1Standard OperationSafety Walkaround Complete - Hot Cell areaA safety walkaround was completed for the
ARIEL Hot Cell area.
The resulting spreadsheet can be
  
  76   Thursday, December 12, 2024, 15:57 Aaron TamHot Cell 1DevelopmentAPTW Pistons Gas lines exchange testingDecember 12, 2024 - Chad Fisher,
Albert Kong, Aaron Tam 
Tests:
 13x 
  77   Thursday, December 12, 2024, 16:20 Aaron TamHot Cell 1DevelopmentExtraction Electrode Banana Plug (Show and Tell) December 12, 2024 - Chad
Fisher, Albert Kong, Aaron Tam, Austin Hagen
Tests:
 6x 
  89   Wednesday, April 23, 2025, 13:40 Aaron TamHot Cell 1DevelopmentAPTW Front End Gate Valve Assembly Installation Previously  29x 