    Reply  Tuesday, April 12, 2011, 12:07, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down 

John Wong wrote:

All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction process is done inside the  fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done.

 

On 3/31/2011 2:01 PM, Jonathan Aoki wrote:
> Razvan and I took a closer look.  We found that power to the fumehoods
> likely was not lost (they are fed from a different panel), but that EF14
> and EF15 would have tripped off.  These two fans serve the room 06 and 07
> fumehoods.
>
> This is an oversight on my part and I apologize for any inconvenience --
> EF14 and 15 are clearly stated on P-370's directory.  I hope that no
> damage was done.
>
> I will leave it to your discretion, but this (in my opinion) is worthy of
> an NCR.  I've updated my planned power outage notes.  This should not
> happen again.
>
> Jon
>
>
>> Thank Jon.
>>
>> Pierre
>>
>> Le 2011-03-31 à 13:37, "Jonathan Aoki"<jonaoki@triumf.ca>  a écrit :
>>
>>> Razvan&  Franco,
>>>
>>> Yesterday, during the MCC-X power down there was one unexpected event --
>>> the fumehoods in Marik's cold/hot labs tripped off.
>>>
>>> According to the documentation that I have, the following panels were to
>>> be affected:
>>> P-370
>>> P-378
>>> P-384
>>> P-396
>>> P-418
>>>
>>> I have print-outs of all of the circuit directories and I don't see any
>>> mention of the fumehood fans.
>>>
>>> Can you please trace the fans' electrical feed and let me know so that I
>>> can update our directories?
>>>
>>> Thanks,
>>> Jon
>>>
>>
>
Entry  Tuesday, January 23, 2018, 11:58, Laura Lambert, , , All BeO removed from Labs! 

 Tuesday, January 23, 2018, 11:55

Portable glove box with everything inside, contaminated beakers, pellets and BeO dissolved in acid were all removed from the cold lab today!!!

Transported for waste removal.


 

Entry  Thursday, March 20, 2025, 13:50, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab  Actinide_Mass_Balance_-_11_Mar_2025.pdf

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 11, 2025, at 2:00 p.m. with an accuracy of 0.02%.

Entry  Wednesday, March 27, 2024, 13:42, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab Actinide_Mass_Balance_-_27_Mar_2024.pdf

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%.

Entry  Tuesday, April 18, 2023, 17:40, Keyur Chauhan, Fixed, 1, Actinide Mass Balance Calibration Actinide_Mass_Balance_-_18_Apr_2023.pdf

ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on April 18, 2023, at 10:40 a.m. with an accuracy of 0.01%.

Entry  Wednesday, November 26, 2014, 14:01, Laura Lambert, , ,  
 
Entry  Thursday, August 01, 2024, 15:03, Darwin Ortiz Rosales, , ,  

Ultrasonicator in Cold Lab:  The ultrasonicator cooling lines and their operation was checked.  The functionality of the probe and operation software was checked.  Visual inspection of probes and water receptacle showed good operational condition. 