61
|
Thursday, August 01, 2024, 15:03 |
Darwin Ortiz Rosales | | | |
Ultrasonicator in Cold Lab: The ultrasonicator cooling lines and their operation was checked. The functionality of the probe and operation software was checked. Visual inspection of probes and water receptacle showed good operational condition. |
|
62
|
Tuesday, October 15, 2024, 09:21 |
Darwin Ortiz Rosales | Fixed | | Hotlab glovebox catalyst regeneration |
Tuesday, October 15, 2024, 09:22
The glovebox catalyst was regenerated. No issues. Removed TCE and PVB from inside the glovebox. These were vestiges from the previous UCx production process. |
|
63
|
Thursday, November 21, 2024, 11:48 |
Aaron Schmidt | | | Change glove on Ar Glove box (2) |
Thursday, November 21, 2024, 11:46: 2 Glovebox gloves were changed. The far right glove & the far left glove.
No contamination was found on the sealing edges of the glove box. Both old gloves were placed in bags & placed in the alpha waste bin.
Work Permit: I2024-11-21-2
Note* Changing both inner gloves is recommended later. We had considered to do both however the O2 ppm spiked after the change of the first two. We were at 185 ppm & aim to not cross 200 ppm.
Additional info:
The remaining gloves were inspected and appeared in acceptable condition. A regeneration was performed shortly after and the gas lines, pump lines were also inspected. This will be considered as the inspection for the current inspection cycle.
Darwin |
|
64
|
Monday, December 16, 2024, 12:15 |
Aaron Schmidt | Completed | | Q4 - 2024 Ball Mill Calibration & Inspection |
Fritsch Pulverisette 5 Ball Mill status:
Monday, December 16, 2024, 12:12:
SN 05.6010 / 03005: Inspected. Ok.
SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)
|
Attachment 1: Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
|
|