Entry  Thursday, August 01, 2024, 15:03, Darwin Ortiz Rosales, , ,  
Ultrasonicator in Cold Lab:  The ultrasonicator cooling lines and their operation was checked.  The functionality of the probe and operation
software was checked.  Visual inspection of probes and water receptacle showed good operational condition.  
Entry  Tuesday, October 15, 2024, 09:21, Darwin Ortiz Rosales, Fixed, , Hotlab glovebox catalyst regeneration 
Tuesday, October 15, 2024, 09:22 
The glovebox catalyst was regenerated.  No issues.  Removed TCE and PVB from inside the glovebox.  These were vestiges from the
previous UCx production process.
Entry  Thursday, November 21, 2024, 11:48, Aaron Schmidt, , , Change glove on Ar Glove box (2) 
 Thursday, November 21, 2024, 11:46: 2 Glovebox gloves were changed. The far right glove & the far left glove. 
No contamination was found on the sealing edges of the glove box. Both old gloves were placed in bags & placed in the alpha waste bin.
Work Permit: 
Entry  Monday, December 16, 2024, 12:15, Aaron Schmidt, Completed, , Q4 - 2024 Ball Mill Calibration & Inspection  Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
 Fritsch Pulverisette 5 Ball Mill status:
Monday, December 16, 2024, 12:12:
SN 05.6010 / 03005: Inspected. Ok. 