Thursday, August 01, 2024, 15:03, Darwin Ortiz Rosales, , ,
|
Ultrasonicator in Cold Lab: The ultrasonicator cooling lines and their operation was checked. The functionality of the probe and operation
software was checked. Visual inspection of probes and water receptacle showed good operational condition. |
Tuesday, October 15, 2024, 09:21, Darwin Ortiz Rosales, Fixed, , Hotlab glovebox catalyst regeneration
|
Tuesday, October 15, 2024, 09:22
The glovebox catalyst was regenerated. No issues. Removed TCE and PVB from inside the glovebox. These were vestiges from the
previous UCx production process. |
Thursday, November 21, 2024, 11:48, Aaron Schmidt, , , Change glove on Ar Glove box (2)
|
Thursday, November 21, 2024, 11:46: 2 Glovebox gloves were changed. The far right glove & the far left glove.
No contamination was found on the sealing edges of the glove box. Both old gloves were placed in bags & placed in the alpha waste bin.
Work Permit: |
Monday, December 16, 2024, 12:15, Aaron Schmidt, Completed, , Q4 - 2024 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball Mill status:
Monday, December 16, 2024, 12:12:
SN 05.6010 / 03005: Inspected. Ok. |
|